<br />COLORADO RIVER STORAGE PRO~ECT
<br />
<br />29
<br />
<br />Justifiable flood-controt, expenditure
<br />Flood control benefits, as estimated by the Corps of Engineers, were
<br />used as the I'ustifiabl~ flood-control expenditure. These 11l1ve bee.n
<br />evaluated on y for the. Navaho unit and are estimated at $1,135,000
<br />as the present worth of $31,000 annually over 100 years at 2% percent
<br />interest. No estimate was made of the cost of the cheapest alterna-
<br />tive means of providing flood control for considemtion as the justifiable
<br />flood-control expenditure as the cost of such an alternative would far
<br />exceed the anticipated flood-control benefits.
<br />
<br />RESULTS OF ALLOCATIONS-STORAGE PROJECT AND PARTICIPATING
<br />PROJECTS
<br />
<br />A summary of the derivation of the allocations made for the storage
<br />project is shown in the following t.>lble. Results of the allocations
<br />made for the stomge.project and for the partieip>lting projects >lre
<br />summarized on pages 30 and 31.
<br />
<br />Deriva.tion of cost allocations-Colorado R'i!Jcr s.torage project! (separable CQsts-
<br />remaining benefits melkoa')
<br />[In thousands of dollars]
<br />
<br /> Il'rlgn- FlooJ Ree-
<br /> tlon Power control Suhtotal r(lB.. TotfU
<br /> UOH
<br />1. Denofits:l_________________ndn__________ 330,000 1,4.75,803 1,135 1,800,g38 ___u__ .-.-.-....
<br />2. Alternative slnglo-purpooll cost ,______u___ 232,179 1,478,803 (') ________u_ n_u__ ____n____
<br />3. JusW'Inblo ().~polld[turo_~_____~_.___.______ 232,171l 1,478,803 1,135 J,712,117 unn. n_n_nn
<br />4. Inttlallysopomblccosts.__n_"n____nnn 033,6/il n_nn_ 933,651 '50 1134,310
<br /> tl ConstructIon costs_._~_..____...__ 373,Hi8 -----..- 373,158 '50 373,817
<br /> bJ Intorostdurlng constructlon____n_ 22,167 n.nn_ 22,157 ---..-- 22,167
<br /> c Operation, IDl\lntenallce, o.nd 1'0.
<br /> plncomont costs_n_~_h.___..... 21/j, 913 __n___> 215,913 __nn. 21/j, 913
<br /> (d) TaxE's rorogone....n.~nnnnn__ -232;iio- 322,423 nn_n_ 322,423 ___nn 322,423
<br />6. Relllnlnln~ bonol1ts bofore dual costs_ .__n 54.5,162 1,135 778,466 n_nn nn_nn_
<br />6. Allo~ted llal costs3.h_..u__..n.h__.__ 45,422 n_u_.u__ 220 45,651 _nn__ 46,651
<br /> r) Construction costs.._~____._______ 42,121 n__.n__n 212 42,333 u_nn 42,333
<br /> bJ Interest durIng constrqctlon___nn 2,391 n_n_nn_ 12 2,4.03 n_nn 2,403
<br /> c Operation, TUl\lntonanco, and rG-
<br /> plaoomOlltcOsts_n_L_n_n_n__ '10 ____u____. , '15 ------- ,),
<br />7. Remo.!nlllf. bonoflts_ ____..n.n~._.~_ .____ 186,757 645,162 906 732,815 .____n
<br />8. Allooo.tod Oll1tcostsl___nn_~nnn_n___ 70,664. 223,979 __nn__ 300,643 ___nn 300,643
<br /> t) ConstructlOl1cost.'3___oI_h__U_h__ 65,790 192,210 n___n_ 258,000 ____n_ 258,000
<br /> b) Intorest durlng constrLlctlonun___ 5,151 15,048 _n_n__ 20,190 ___nn 20,190
<br /> c) Oportltlon, ma.lntollnnpo. and 1'0-
<br /> pII\Cemolltcosts__._.nnnn_n_ 5,723 16,721 _n___n 22,'14.4 n___n 22,444
<br />9. Totl\lallocatloll:l___n_n_n__.'___n__n_n 122,086 1,167,630 220 1,279,945 659 1,280,604
<br /> (a.? Construction costs___1____________ 107,011 .5ll5,368 212 673,491 '50 674,lliO
<br /> ~b Interost dnrlllg constnictlouu__n_ 7,54.2 37,205 12 44,750 ___nn 44,769
<br /> c) Oporatlon, IllO.lntonan06. nnd 1'0-
<br /> pll\comontcosts....~_____n_._n 6,033 232,634 , 239,272 nnn_ 239,272
<br /> Cd) TlL'(CS foregone__n.U~_._.h_.__._ ..__.__n 322,423 _n_nn 322,423 ___nn 322,423
<br />10. Oonstructlon costs:
<br /> (aJ ExcludIng lnteroot during COll'
<br /> structton________________________ 107,Oll 565,308 212 673,491 05' 674,150
<br /> (b) Including lntorest dllrlng con. 71S,gOg
<br /> structtollat2J.i perC6ul_______n_ 115,463 002,573 .24 718,2&1 05'
<br /> (c) Inoludlng reimbursable Interest
<br /> during oonstruotloll ~at 2}i per-
<br /> conL_______________~____________ 107,911 609,277 212 717,400 659 718,059
<br />II. Annual oporatlon, mo.lntene.r.lco, and re-
<br /> plo.cementcosts: :
<br /> ~a) Based on 2~ perconL~nn___n_n )81 0,354 0 6,535 n__n~ 6,535
<br /> b) Bused on 2 porconL~n__________ 174 6,108 0 6,282 n_nn 6,282
<br />
<br />I No cost hllS been alloCA.ted to f1~h and wlldJLre because studlf's of th!.<l functIon have not been completed.
<br />Futurestud.les may result 11I1I1IOCI\t!ons to thIs Bud other functlOllsnot presently included.
<br />:l Present worth or anlllll\l bonollts over 100 yoars at 2M perC('llt Interest..
<br />, Include CODstruotlOll costs wltb exception of e.'(pcndltures from contributed funds and Colorado River
<br />Development Fund, mterest dnrllJ.it cOllstructlon at 2}~ porcent, oporntlon. mlllntollBIICO, rllld repln.ceuJent
<br />costs, and ta.xes forogone when ElpproprlElte. Figures lor operatton, malntenanoo, and replt"u:eroent costs
<br />flUd ta.'(e.!j forogono aro present values computed ror a loo.year period at 2}1 percent.
<br />I Greatm. tllau benoflts. .
<br />
<br />j
<br />i
<br />
|