My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP10984
CWCB
>
Water Supply Protection
>
Backfile
>
10001-10999
>
WSP10984
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 3:15:32 PM
Creation date
10/12/2006 4:38:52 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8443.600
Description
Narrows Unit - Studies
State
CO
Basin
South Platte
Water Division
1
Date
5/1/1969
Author
BoR
Title
Reevaluation Statement Narrows Unit, Colorado As a proposed part of the Missouri River Basin Project
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br />II <br /> <br /> <br />Project Economics <br /> <br />The estimated $125,000 cost to rehabi litate Jackson Lake Dam would <br />serve both general recreation and fish and wildlife. For alloca- <br />tion purposes, the cost can be divided equally between these two <br />functions. <br /> <br />The Colorado Division has agreed to cost-share the $125,000 rehab- <br />ilitation cost for Jackson Lake Dam and the $815,000 cost for the <br />hatchery unit equally with the Federal Government in accordance <br />with the provisions of the Federal Water Project Recreation Act <br />(79 Stat. 213). The Colorado Division also would assume the annual <br />operation, m9intenance, and replacement costs of $18,000 for Jackson <br />Lake Dam and '$64,700 for the hatche ry un i t. <br /> <br />. <br /> <br />As indicated in Table 3, Costs of State Wildlife Management Area, <br />the estimated specific cost of acquiring sufficient land and devel- <br />oping it amounts to a capital cost of $2,635,0.00, with an annual <br />OM&R cost of ~37,000. As explained in our 1966 report, the manage- <br />ment area would mitigate as well as enhance fish and wildlife <br />therefore the costs associated with the area should be proportion- <br />ally divided., Our estimates indicate that 47.3 percent of the total <br />cost of $2,63$,000 or $1,246,000 should be attributed to mitigation <br />and thus be included with joint costs, and that 52.7 percent or <br />$1,389,000 should be attributed tOe enhancement. Of this $1,389,000, <br />41.6 percent pr $578,000 should be nonreimbursable (producing water- <br />fowl use benefits of national significance in the amount of $30,600), <br />and $811,000 ~hould be cost shared (producing upland-game hunting <br />benefits of $4,500; waterfowl hunting benefits of $27,000; and <br />wildlife-orierited recreation benefits of $11,500). <br /> <br />The annual OMIR cost of $37,000 sho~ld be divided into $18,000 of <br />joint costs, ~erving mitigation, and the balance of $19,000, serving <br />enhancement, to be borne by the Co I orado D i vis i on of Game, Fish and <br />Pa rks. <br /> <br />In summary, our analysis shows that the fish hatchery and rearing <br />unit described in this report supplement would contribute signifi- <br />cant fishery benefits to the Narrows Unit. We shall be pleased to <br />assist your st9ff in integrating the fish hatchery and rearing unit <br />into the project plan in order to real ize the full potential for fish <br />and wildlife. <br /> <br />Any mod i fi cat i on or change in the p rqject plan shou I d be b rough t to <br />the attention of the Bureau of Sport Fisheries and Wildlife and the <br /> <br />11 <br /> <br />! <br />
The URL can be used to link to this page
Your browser does not support the video tag.