My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP10984
CWCB
>
Water Supply Protection
>
Backfile
>
10001-10999
>
WSP10984
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 3:15:32 PM
Creation date
10/12/2006 4:38:52 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8443.600
Description
Narrows Unit - Studies
State
CO
Basin
South Platte
Water Division
1
Date
5/1/1969
Author
BoR
Title
Reevaluation Statement Narrows Unit, Colorado As a proposed part of the Missouri River Basin Project
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br />3 <br /> <br />100 bodies of water within the State. Supplemental warmwater fish <br />and fish eggs must be obtained from other sources. <br /> <br />. <br /> <br />Colorado's fish production facilities are continuously being ex- <br />panded withi'n the limits of State funds. Unfortunately, the need <br />for hatchery, fish to stock Federal reservoi rs, such as Narrows <br />Reservoir, is increasing faster than funds and Federal assistance <br />to meet these needs. <br /> <br />The fish production site which has been investigated by the Colorado <br />Division of :Game, Fish and Parks would consist of about 120 acres <br />located just downstream of the proposed Narrows Dam in Section 17, <br />18, and 20, ,Range 58 West, Townsh i p 4 No rth. The hatche ry site 1 i es <br />within the proposed project takeline on lands within the area re- <br />quested for recreational development by the National Park Service. <br />R<<cre.ational use at the hatchery would be coordinated with and would <br />be compatible with the recreation plan proposed by the National Park <br />Service. No additional land would need to be acqui red for the <br />hatchery. The unit would be a combination warmwater and coldwater <br />hatching and rearing unit which would produce fry and fingerl ings <br />to stock project waters. The entire output of the unit would be <br />used in project waters of the Narrows Unit. <br /> <br />Because of geological formations, seepage from Narrows Dam is ex- <br />pected to be 20 second-feet when the reservoir is at minimum pool <br />and about 8Q second-feet when the reservoi r is full. Temperature <br />of the seep 'water is expected to be about the same as ground water <br />in the area; or approximately 550 F. The water quality of several <br />wells in the area indicates that the water would be suitable for fish <br />production. <br /> <br />Project plans include the collection of seep water by a series of toe <br />drains in the dam. A 36-inch drain conduit would collect and dis- <br />charge the water into a holding tank just downstream of the dam. <br />Water for the hatchery would be taken from the bottom of the tank via <br />a pressure j:lipe capable of carrying 20 second-feet of water with a <br />20-foot head. An overflow pipe would be installed near the top of <br />the tank to ,return surplus water to the river. The pressure pipe <br />would transport the water from the dam to the aeration pond where it <br />could be aerated or bypassed to the raceways and rearing ponds. <br />Separate pipes would carry water from the aeration pond to the basin <br />house and to the raceways. <br /> <br />When Narrows Reservoi r is low, it may be necessary to supplement <br />water drainIng from the right abutment with water draining from <br /> <br /><< <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.