Laserfiche WebLink
<br />o <br />t'- <br />{'- <br /> <br />..- <br /> <br />NED plan <br /> <br />EQ plan <br /> <br />ESTIMATED COST <br /> <br />Construction cost (January 1974 prices) <br />Annual operation, maintenance, and <br />replacement cost (1971-1973) <br /> <br />138,340,000 <br /> <br />23,130,000 <br /> <br />9,175,000 <br /> <br />70,000 <br /> <br />BENEFIT COST ANALYSIS <br /> <br />Average annual benefits <br />Municipal and industrial <br />Power <br />Recreation <br />Fish and wildlife <br />Irrigation <br />Flood control <br />Total <br /> <br />2,674,200 2,674,200 <br />23,988,500 <br />113,800 113,800 <br />NA NA <br />105,300 105,300 <br /> NA <br />26,881,800 2,893,300 <br />18,497,000 1,720,800 <br />1.45:1 1. 68 : 1 <br /> <br />Annual equivalent costs (5 5/8 percent <br />interest) <br />Benefit-cost ratio <br /> <br />lThis occurs during winter. Average fluctuation during recreation season <br />May through September is less than 3 feet. <br /> <br />2 <br />Rolled earth construction <br />