My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP10967
CWCB
>
Water Supply Protection
>
Backfile
>
10001-10999
>
WSP10967
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 3:15:28 PM
Creation date
10/12/2006 4:38:22 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8200.765
Description
Little Snake River General
State
CO
Basin
Yampa/White
Water Division
6
Date
6/1/1989
Author
DOI-BLM
Title
Little Snake Resource Management Plan and Record of Decision
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
92
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />CHAPTER D <br /> <br />Monitoring <br /> <br />Rangeland monitoring studies will be initiated imme- <br />diately on all allotments to yield infonnation needed to make <br />decisions on liveslOck slocking rates. These studies will be <br />prioritized according to critical resource conflicts and existing <br />resource damage. The level of monitoring on the lower <br />priority allotments will depend on funding and staff mg. <br /> <br />Support <br /> <br />Surface reclamation, hydrologic, soils, and archaeology <br />support will be required in the planning of range projects. <br />The support of Zone engineers will be needed to conduct <br />feasibility studies, contract out project work, or complete <br />the projects using Zone equipment and personnel. Other <br />resource specialists will assess impacts of proposed projects <br />and identify mitigation, if needed. Fire management support <br />will be used for managing natural fire and prescribed burns. <br />Cadastral survey will locate any needed public land <br />boundaries. <br /> <br />Wildlife Habitat <br /> <br />Objectives <br /> <br />. Improve those rangelands that are key wildlife habitats <br />and have the potential for increased forage production <br />for wildlife grazing by improving soil and water <br />resources. Maintain those rangelands that are at their <br />desired plant communities. <br /> <br />. Detenoine stocking rates for wildlife and livestock that <br />result in proper use of the public rangelands within <br />the 13 conflict allotments. Issue decisions or enter into <br />agreements to establish forage use and grazing capacity. <br />The BLM will consult with the Colorado Division of <br />Wildlife, affected grazing permittees, and other <br />interested parties. <br /> <br />Planned Actions <br /> <br />I. Forage will be provided on BLM land 10 maintain <br />approximately 66,400 mule deer, 6,500 elk, 6,300 <br />pronghorn, and 70 bighorn sheep. This will contribute <br />to total resource area big game populations of 110,660 <br />mule deer, 21,700 elk, 8,350 pronghorn, and 70 bighorn <br />sheep until further monitoring studies are completed <br />and proper slOCking rates are established. <br /> <br />2. BLM will immediately begin monitoring studies on M <br />and I category allotments, including 13 conflict <br />allotments (allotment numbers 4203, 4206, 4207, 4209, <br /> <br />4210,4219,4225,4302,4431,4432,4520, 4521,and <br />4522), to yield infonoation needed to make decisions <br />on wildlife numbers. Priorities for monitoring studies <br />will be determined by the worst forage conditions, as <br />established from the 1981-1983 surveys. The level of <br />monitoring will depend on funding and personnel. <br /> <br />3. Wildlife-use adjustments will be implemented through <br />consultation and coordination with the Colorado <br />Division of Wildlife (CDOW) if monitoring data <br />indicate that adjustments are necessary. Negotiation to <br />implement changes in wildlife use will proceed as soon <br />as data are available to support that change. <br /> <br />4. Wildlife habitat will be maintained or improved through <br />mitigation or restrictions applied to all wildlife habitat- <br />disturbing activities. <br /> <br />5. Wildlife habitat will be maintained or improved by <br />using seasonal restrictions on activities to maintain <br />wildlife production areas and important wildlife habitat <br />(see Table 4). <br /> <br />TABLE 4 <br /> <br />DATES ALLOWED FOR <br />RESOURCE DEVELOPMENT IN <br />AREAS OF WILDLIFE CONCERNS <br /> <br />Type of Wildlife Concern <br /> <br />Dates Activity Allowed <br /> <br />Greater sandhill crane <br />nesting and staging <br />area buffer woes <br /> <br />Sage grouse strutting <br />ground buffer zone <br /> <br />Critical raptor nest buffer wnes <br /> <br />Bald eagle habitat <br /> <br />Sharptail grouse <br />dance ground buffer zone <br /> <br />Mule deer and elk <br />migration routes <br /> <br />Mule deer, bighorn sheep, <br />pronghoro antelope, <br />mountain lion, <br />elk critical winter range <br /> <br />Elk calving <br /> <br />Pronghorn antelope fawning, <br />bighorn sheep lambing <br /> <br />Ocr. 15 ' Feb. 28 <br /> <br />June I ' Feb. 28 <br />Aug. t ' Jan. 31 <br />April 15 - Oct. 31 <br /> <br />June 15 ' March 15 <br /> <br />May 15 - Oct. IS and <br />Dee, 1 ' March 15 <br /> <br />April IS - Nov. 30 <br /> <br />July I ' April 15 <br /> <br />July I - April 30 <br /> <br />12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.