My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP10960
CWCB
>
Water Supply Protection
>
Backfile
>
10001-10999
>
WSP10960
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 3:15:25 PM
Creation date
10/12/2006 4:38:14 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8111.800
Description
Arkansas River Compact Administration
Basin
Arkansas
Date
5/23/1985
Author
CWCB
Title
Report on Nee Gronda Reservoir
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />. <br />I <br />I <br />. <br />. <br />. <br />I <br />I <br />I <br />I <br />I <br />I <br />'. <br />I <br />. <br />I <br />I <br />I <br /> <br />Engineering Hydrology <br /> <br />1. Identify faculty and student resources and acquire commitment. <br /> <br />2. Develop Phase I component workplan. <br /> <br />3. Develop water budgets--annual and seasonal. <br /> <br />o precipitation <br /> <br />o canal and local inflows <br /> <br />o evaporation <br />o reservoir outflows <br /> <br />o groundwater outflow <br /> <br />4. Develop preliminary engineering alternatives for operating the reservoir, <br />e.g. reducing dead storage. <br /> <br />5. Develop preliminary as~essment of operating alternatives. <br /> <br />6. Develop water budget model.' <br /> <br />o Water budget componerits',;,", <br />o Model equations <br /> <br />~"'~." ,.... . <br /> <br />1" <br /> <br />o Decision variables' <br />o Coding and debugging <br />o Testing and calibrating <br />o Interactive input and output <br />'0 Graphics display <br />7. Review operating alternatives for model. <br />8. Evaluate operating alternatives. <br />o Simulation inputs <br />o Simulation runs <br /> <br />o Output summarization <br /> <br />9. Integrate with other study components. <br /> <br />10. Public meeting to explore operating options with SECRA and other <br />stakeholders via computer simulation. <br /> <br />11. Write and-produce Phase II~Component Report and Phase III Management Plan. <br /> <br />'" <br />
The URL can be used to link to this page
Your browser does not support the video tag.