Laserfiche WebLink
<br />ALLOCATION <br />OF FEDERAL <br />INVESTMENT <br /> <br />A preliminary allocation of lolal esti~ <br />mated costs for all authorized projects, <br />including the provisionally authorized <br />Uinlah Unit ollhe Central Utah Project. <br />is summarized in the table on the right. <br />Allocations to the various purposes <br />authorized under Reclamation Law are <br />required by Section 6 of Public Law <br />84-485. the Colorado River Storage <br />Project Act. excluding specific Fish <br />and Wildlife and Recreation expendi- <br />tures authorized by Section 8 of this <br />Act. Final allocation reports have been <br />prepared on the Florida, Paonia, Sill <br />and Smith Fork Projects. and the Vernal <br />Unit of the Central Utah Project-all <br />other allocations are tentative. (See <br />Exhibit 8 in Appendix lor authorized <br />projects and individual project costs <br />by purpose served,) <br /> <br />ALLOCATION OF ESTIMATED COSTS <br /> <br />Percenl <br />(Thousands 01 Talal <br />01 Dollars) Allocation <br /> <br />Project Costs Allocated (Excludes Section 8 Costs) <br />Reimbursable Allocations: <br />Irrigation <br />Power <br />Municipal and Industrial Water <br />Other <br />Total <br /> <br />Nonreimbursable Allocations: <br />Flood Control <br />Fish and Wildlife <br />Recreation <br />Road Relocation Costs, Public Law 87-874 <br />Total <br /> <br />Other: <br />Navajo Indian Irrigation Project' <br /> <br />Total Costs Allocated <br /> <br />Section 8 Costs: <br />Fish and Wildlife <br />Recreation <br />Total Costs Not Allocated <br /> <br />TOTAL <br /> <br />943, , 26 <br />689,198 <br />317,728 <br />3,808 <br />1,953,860 <br /> <br />14.126 <br />87,515 <br />4,975 <br />15,137 <br />121,753 <br /> <br />207,500 <br /> <br />2,283,113 <br /> <br />40,645 <br />41,673 <br />82,318 <br /> <br />2,365,431 <br /> <br />41.3 <br />302 <br />13.9 <br />.2 <br />85.6 <br /> <br />,6 <br />3.8 <br />2 <br />.7 <br />5.3 <br /> <br />9.1 <br /> <br />100_0 <br /> <br />'Repayment of constrUCllon costs IS subject to Ihe Act of July f, 1932 (47 Stal 564) <br /> <br />25 <br />