My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP10956
CWCB
>
Water Supply Protection
>
Backfile
>
10001-10999
>
WSP10956
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 3:15:24 PM
Creation date
10/12/2006 4:37:31 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8210.470
Description
Pacific Southwest Interagency Committee
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
8/1/1963
Author
PSIAC
Title
Pacific Southwest Water Plan - Appendix - August 1963
Water Supply Pro - Doc Type
Report/Study
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
301
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />002286 <br /> <br />Mapping ComPleted and CUrrently in Pr~ss <br /> <br />Of the 180,000 square miles in the Pacific Southwest as here <br />defined, about 113,500 square miles or 63 percent is covered b,y <br />topographic maps at standard accuracy. (See fig. 3). Most 01' these <br />maps are published, but a few are available in advance copy ~. <br />In addition, mapping is in early stages over about 7 percent 01' the <br />area. <br /> <br />. <br /> <br />'.!his caupleted mapping covers most of the areas at the Central <br />Arizona Aqueduct, Charleston !)un and Reservoir, and Marble ~on <br />Dam and Reservoir units understood to be proposed b,y the Bureau at <br />Reclamation. With work in progress, it also covers parts at the <br />Granite Reef Aqueduct, Maxwell Dam and Reservoir, and Buttes Dam <br />and Reservoir units. <br /> <br />Short-range Schedule <br /> <br />'.!here is proposed a short-range or six-year schedule at <br />topographic mapping to cauplete work now in progress and to make <br />certain new starts in 1965-1967. Latest 01' the new starts would <br />produce advance copy b,y 1969 and published maps by 1970. !lbe proposed <br />schedule is based on the cons,truction priorities understood to have <br />been set by the Bureau of Reclamation, also on SUrvey proposals for <br />hydrologic and geologic investige.tioos. In total, the six-year <br />mapping schedule would cover about 14,500 square miles in six project <br />areas, as follows: <br /> <br /> Project Square Year to <br /> Miles start <br /> , <br /> Reserve north 740 1965 <br /> Granite Reef Aqueduct and other <br /> Central Arizona Project work 2,400 1965 <br /> Hooker Dam and Reservoir unit 1,450 1965 <br />. Bridge Ce.~on 1,950 1966..1967 <br />Kaiparowits Plateau and Kanab <br />coal field 950 1966-1967 <br /> other mapping 7,000 1966-1967 <br /> <br />ComPtetion at the Bridge Canyon project under this schedule will <br />provide topographic coverage, in either the 7!- or the l5-minute series, <br />at all the reach at the Colorado River from the Utah-Colorado bauncJary to <br />the United states-Mexico bounde.r,y'. (See fig. 3). <br /> <br />12 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.