Laserfiche WebLink
<br />31 <br /> <br /> <br />iHJ2271 <br /> <br />Payout Analysis <br /> <br />The following tabulation presents a consolidated summary of <br />the payout analyses used in determining the financial feasibility <br />of the plan. The tabulation indicates the subsidy assistance <br />required for irrigation and municipal and industrial water. The <br />accumulative development, as shown, reflects the net revenue by <br />the year 2044 after irrigation and municipal and industrial <br />assistance has been provided. <br /> <br />. <br /> <br />The tabulations reflect buildup in revent1t",due to increased <br />deliveries of irrigation and municipal and industrial water. The <br />payout extends from 1967 through 2044, a period of 78 years. This <br />period reflects a full 50-year period after the last facility has <br />been placed in service. Under this method of payout analysis, <br />a facility continues to contribute revenue to the development fund <br />after costs allocated to the facility have been repaid. <br /> <br />. <br />