My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP10956
CWCB
>
Water Supply Protection
>
Backfile
>
10001-10999
>
WSP10956
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 3:15:24 PM
Creation date
10/12/2006 4:37:31 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8210.470
Description
Pacific Southwest Interagency Committee
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
8/1/1963
Author
PSIAC
Title
Pacific Southwest Water Plan - Appendix - August 1963
Water Supply Pro - Doc Type
Report/Study
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
301
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />28 <br /> <br /> <br />002257 <br /> <br />). ':' <br /> <br />From Pearblossom Pumping Plant, a new conduit, with a capacity <br />of 2,000 c.f.s., would be constructed to Lake Havasu--a distance of <br />about 270 miles. Four power generating plants would be installed to <br />use the available head along this route. Two plants would have a <br />head of about 475 feet each; one would have a head of about 975 feet, <br />and the drop into Lake Havasu would be about 515 feet. <br /> <br />. <br /> <br />The capital cost of the conveyance from the California Aqueduct <br />at Pearblossom Pumping Plant to Lake Havasu is estimated at <br />$170,000,000, including the four powerplants. The annual operation, <br />maintenance, and replacement cost is estimated at $2,150,000. Approx- <br />imately 2,400,000,000 kilowatt-hours would be generated in the four <br />powerplants. The net cost of pumping between Wheeler Ridge Pumping <br />Plant and Lake Havasu is estimated at $9,850,000. <br /> <br />For conveying the 1,200,000 acre-feet of additional water, the <br />capital cost from the Delta to Lake Havasu is estimated to total <br />$420,000,000. Operation, maintenance, and replacement costs are <br />estimated at $4,075,000, and annual costs of pumping at $16,950,000. <br /> <br />The estimated total capital cost for this prospective plan, <br />including storage reservoir systems, incremental conveyance through <br />the East Side Division, and thence through a portion of the California <br />Aqueduct, and a new conduit to Lake Havasu is $1,020,000,000. The <br />net annual operation, maintenance, replacement, and pumping costs <br />are estimated to be $24,000,000. This plan would require concurrent <br />authorization of the ~equired incremental conveyance capacity and the <br />East Side Division, Central Valley Project. The storage systems used <br />in this plan, along with the other facilities, are included for <br />analysis purposes. An alternative storage development, more desirable <br />for meeting the requirements of other areas as well, may be developed <br />in the future. <br /> <br />. <br />
The URL can be used to link to this page
Your browser does not support the video tag.