My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP10956
CWCB
>
Water Supply Protection
>
Backfile
>
10001-10999
>
WSP10956
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 3:15:24 PM
Creation date
10/12/2006 4:37:31 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8210.470
Description
Pacific Southwest Interagency Committee
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
8/1/1963
Author
PSIAC
Title
Pacific Southwest Water Plan - Appendix - August 1963
Water Supply Pro - Doc Type
Report/Study
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
301
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />23 <br /> <br /> <br />002200 <br /> <br />systems, required for East Side Division is about $600,000,000. <br />This East Side Division is proposed for authorization, construc- <br />tion, and operation as an integral part of the Central Valley <br />Project. In order to accomplish the conveyance of the additional <br />1,200,000 acre-feet to southern California, concurrent authoriza- <br />tion and construction of the facilities would be required. <br /> <br />. <br /> <br />Two other facilities, the Delta Peripheral Canal and the <br />Kellog Unit, also should be associated with this proposed plan <br />for authorization as part of the Central Valley Project, with <br />financial participation by the State and other agencies as appro- <br />priate. These facilities will offset, in particular, adverse <br />effects which may occur to water supplies in the Delta area due <br />to further water supply development in the Central Valley Basin <br />and increased diversions from the Delta. The total cavital costs <br />of these features are estimated at $125,000,000, with annual OM&R <br />costs, including pumping, of $1,200,000, <br /> <br />. <br />
The URL can be used to link to this page
Your browser does not support the video tag.