Laserfiche WebLink
<br />23 <br /> <br /> <br />002200 <br /> <br />systems, required for East Side Division is about $600,000,000. <br />This East Side Division is proposed for authorization, construc- <br />tion, and operation as an integral part of the Central Valley <br />Project. In order to accomplish the conveyance of the additional <br />1,200,000 acre-feet to southern California, concurrent authoriza- <br />tion and construction of the facilities would be required. <br /> <br />. <br /> <br />Two other facilities, the Delta Peripheral Canal and the <br />Kellog Unit, also should be associated with this proposed plan <br />for authorization as part of the Central Valley Project, with <br />financial participation by the State and other agencies as appro- <br />priate. These facilities will offset, in particular, adverse <br />effects which may occur to water supplies in the Delta area due <br />to further water supply development in the Central Valley Basin <br />and increased diversions from the Delta. The total cavital costs <br />of these features are estimated at $125,000,000, with annual OM&R <br />costs, including pumping, of $1,200,000, <br /> <br />. <br />