Laserfiche WebLink
<br />9 <br /> <br /> <br />QP2Z42 <br /> <br />The average annual acre-foot cost given is computed by using <br />incremental costs of enlargement of part of the California Aqueduct. <br />Appropriate allocation of costs between the California Aqueduct <br />and the proposed incremental enlargement under this plan may reflect <br />some increase in this acre-foot value. <br /> <br />. <br /> <br />The reservoir storage systems and related diversions to <br />Sacramento River proposed under this plan should be authorized for <br />construction and operation by the Bureau of Reclamation as part of <br />the Pacific Southwest Water Plan, even though they will be inte- <br />grated closely with existing and proposed features of the Federal <br />Central Valley Project. <br /> <br />The facilities proposed under this Plan are the basic m1n1mum <br />facilities required for conserving and conveying the additional <br />1,200,000 acre-feet of water to southern California. Other associ- <br />ated works also should be included along with this proposed plan <br />for concurrent authorization and construction as part of the Central <br />Valley Project. These other related facilities are summarized under <br />Plan 3. <br /> <br />. <br />