My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP10956
CWCB
>
Water Supply Protection
>
Backfile
>
10001-10999
>
WSP10956
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 3:15:24 PM
Creation date
10/12/2006 4:37:31 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8210.470
Description
Pacific Southwest Interagency Committee
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
8/1/1963
Author
PSIAC
Title
Pacific Southwest Water Plan - Appendix - August 1963
Water Supply Pro - Doc Type
Report/Study
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
301
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />9 <br /> <br /> <br />QP2Z42 <br /> <br />The average annual acre-foot cost given is computed by using <br />incremental costs of enlargement of part of the California Aqueduct. <br />Appropriate allocation of costs between the California Aqueduct <br />and the proposed incremental enlargement under this plan may reflect <br />some increase in this acre-foot value. <br /> <br />. <br /> <br />The reservoir storage systems and related diversions to <br />Sacramento River proposed under this plan should be authorized for <br />construction and operation by the Bureau of Reclamation as part of <br />the Pacific Southwest Water Plan, even though they will be inte- <br />grated closely with existing and proposed features of the Federal <br />Central Valley Project. <br /> <br />The facilities proposed under this Plan are the basic m1n1mum <br />facilities required for conserving and conveying the additional <br />1,200,000 acre-feet of water to southern California. Other associ- <br />ated works also should be included along with this proposed plan <br />for concurrent authorization and construction as part of the Central <br />Valley Project. These other related facilities are summarized under <br />Plan 3. <br /> <br />. <br />
The URL can be used to link to this page
Your browser does not support the video tag.