Laserfiche WebLink
<br />~ <br />r-- <br />~ <br />c-J <br /> <br />WEST DIVIDE PROJECT FEATURES <br /> <br />Kendig Reservoir <br />Location: On West Divide Creek <br />Total capacity <br />Active <br />Dead and inactive <br />Shoreline <br />Surface area <br />Dam height <br />Crest length <br /> <br />13 miles south of Silt <br />18,060 acre-feet <br />15,630 acre-feet <br />2,430 acre-feet <br />4.9 miles <br />270 acres <br />197 feet <br />1,350 feet <br /> <br />Dry Hollow Reservoir <br />Location- On Dry Hol/ow Creek <br />Total capacity <br />Active <br />Dead and inactive <br />Shoreline <br />Surface area <br />Dam height <br />Crest length <br /> <br />7.5 miles south oj Silt <br />23,000 acre-feet <br />18,800 acre-feet <br />4,200 acre-feet <br />5.6 miles <br />494 acres <br />170 feet <br />1,850 feet <br /> <br />Dry Hollow Feeder Canal <br />Length <br />Capacity <br />Land served <br /> <br />11.1 miles <br />140 cubic feet per second <br />3,730 acres <br /> <br />Cache Creek Canal <br />Length <br />Inidal capacity <br />Land served <br /> <br />27.7 miles <br />225 cubic feet per second <br />10,430 acres <br /> <br />West Divide Canal <br />Length <br />Initial capacity <br />Land served <br /> <br />12.6 miles <br />95 cubic feet per second <br />6,080.acres <br /> <br />Hunter Mesa Canal <br />Length <br />Initial capacity <br />Land served <br /> <br />9.4 miles <br />130 cubic feet per second <br />4,930 acres <br /> <br />Divide Creek Pumping Plant (to Dry Hollow Feeder Canal) <br />Location: On Colorado River 3 miles east of Silt <br />Lift 620 feet <br />Capacity 140 cubic feet per second <br /> <br />Dry Hollow Pumping Plant <br />Location: At toe of Dry Hollow Dam <br />Unit No. I (to Dry Hollow Reservoir) <br />Lift <br />Capacity <br />Unit No.2 (to Hunter Mesa Canal) <br />Lift <br />Capacity <br /> <br />73 feet <br />120 cubic feet per second <br /> <br />320 feet <br />130 cubic feet per second <br /> <br />West Divide Pumping Plant (to West Divide Canal) <br />Location: On Hunter Mesa Canal, south of Dry Hollow Reservoir <br />Lift 425 feet <br />Capacity 25 cubic feet per second <br /> <br />M&l Pipeline <br />Length <br />Capacity <br /> <br />(Cram Kendig Reservoir to Rifle System) <br />14.2 miles <br />16 cubic feet per second <br />