My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP10943
CWCB
>
Water Supply Protection
>
Backfile
>
10001-10999
>
WSP10943
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/28/2009 11:10:47 PM
Creation date
10/12/2006 4:37:10 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8407.500
Description
Platte River Basin-River Basin General Publications-Missouri River General Publications
Date
1/17/1975
Author
MRBC
Title
1975 Water Assessment-Missouri River Basin-Memorandum of Agreement Between the Missouri River Basin Commission and the US Water Resources Council 1
Water Supply Pro - Doc Type
Operating Principles/Plan
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />.' <br /> <br />Schedule A <br /> <br />Memorandum of Agreement (MOA) <br /> <br />between the <br /> <br />Missouri River Basin Commission <br /> <br />and the <br /> <br />1483 <br /> <br />U.S. Water Resources Council <br /> <br />1975 Assessment of Water and Related Land Resources <br /> <br />Section 1-- Scope of Agreement <br />This document des~ribes the role and responsibilities of the Missouri <br />River Basin Commission (MRBC) in fulfilling the detailed procedures to be <br />followed in conducting Phases II and III of the specific problem analysis <br />portion of the 1975 Assessment as well as the products that will result <br />therefrom. Specifically, attention is directed toward describing who, <br />" <br /> <br />when, where, and how the Missouri River Basin Commission in cooperation <br /> <br />with the U.S. Water Resources Council (WRC) will conduct the activities <br /> <br />referred to in the Missouri River Basin region. <br /> <br />This document also includes an outline of the specific problem analysis <br /> <br />report which is to be prepared by the Missouri River Basin Commission, an <br /> <br />organizational structure for carrying out the assessment activities, a <br /> <br />summary of the work schedules and financial plans, and a proposed procedure <br />for reporting progress to the WRC. <br /> <br />Section II--Public Participation <br />The public participation in the specific problem analysis portion of <br />the assessment will be accomplished utilizing Group B participants as <br />described in Section III of this agreement. However, the states are <br />primarily responsible for their respective public involvements. Each state <br />member of the MRBC represents his state and the public therein. It is the <br />
The URL can be used to link to this page
Your browser does not support the video tag.