My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP10937
CWCB
>
Water Supply Protection
>
Backfile
>
10001-10999
>
WSP10937
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 3:15:20 PM
Creation date
10/12/2006 4:36:56 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8112.600
Description
Arkansas White Red Basins Interagency Committee - AWRBIAC -- Reports
Basin
Arkansas
Water Division
2
Date
10/1/1980
Title
Annual Report 1979 - 1980
Water Supply Pro - Doc Type
Annual Report
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />(::1 <br />.... <br />C.11 <br />(0 <br />...... <br /> <br />EXCHANGE OF PROGRAM INFORMATION STANDING COMMITTEE <br /> <br />a <br /> <br />OVERALL FUNCTIONAL CHARGE <br /> <br />1. Consider and make recommendations to AWRBIAC on methods of operation to <br />improve the exchange of program information in the interest of coordination of <br />anticipated studies, studies in progress, planning, programs, project con- <br />struction agencies, and such other related matters of exchange of program <br />information as may be brought to the attention of the committee by AWRBIAC or <br />its members. <br /> <br />2. Remain sufficiently familiar with the activities of the state and federal <br />agencies to identify problems and potential prOblems involving exchange of <br />information and recommend solutions thereto. <br /> <br />3. Prepare reports, as needed, to reflect progress and status of planning, <br />construction, operation, and other program activities relating to project <br />development of state and federal construction agencies. <br /> <br />CHARGE - FY 1981 <br /> <br />1. Review need for and format and frequency of the preauthorization and post- <br />authorization (construction) status reports and make recommendations to <br />AWRBIAC on any needed changes. <br /> <br />1. Make periodic reports to AWRBIAC on status of High Plains Ogallala Aquifer <br />Study, USGS Ogallala Aquifer Systems Analysis Study, and Llano Estacado Playa <br />Lake Study. <br /> <br />3. Provide to the Southwestern Division Office, Corps of Engineers, as <br />requested program information having specific impact on comprehensive planning <br />process to be developed by the Corps. <br /> <br />4. Submit summary of FY 1981 activities of the EPIC to Chairman, AWRBIAC, by <br />1 October 1981 for inclusion in Annual Report. <br /> <br />15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.