Laserfiche WebLink
<br /> Example III <br /> COST ALIJJCATION <br /> SEPARABLE COSTS - REMAINING BENEFITS METHOD <br /> Flood Fish and Recre- <br /> Item Irrigation Power Control Wildlife ation Total <br /> ----r- ---r- ---r- ---r- -r -r <br /> 1. Benefits 10,000,000 5,000,000 2,000,000 (1) 17 500,.'''00 <br /> , ".- ~;.: ... <br /> 500,000(2) ";',,-'';:'c <br /> 2. Alternate Costs 12,000,000 5,000,000 1,500,000 19,000,000 <br /> 3 . Benefits limited by <br /> alternate cost <br /> (lesser of items 1 & <br /> 2) 10,000,000 5,000,000 1,500,000 500,000 17,000,000 , <br /> , <br />. <br />Q) 4. Separable Costs 5,000,000 1,000,000 500,000 100,000 6,600,000 <br /> .. <br /> r: <br /> 5. Remaining benefits ~\: <br /> (item 3 less item 4) 5,000,000 4,000,000 1,000,000 400,000 10,400,000 .;, <br /> 6. " <br /> Percent of total ,j.;, <br /> remaining benefits 48.1 38;4 9.6 3.9 100.0 " <br /> , <br /> , <br /> 4,569,500 3,648,000 9,50G:Y'JO .,.~ <br /> 7. Allocated Joint costs 912,000 370,500 'r: <br /> " <br /> , <br /> 8. 9,569;500 4,648,oeo 1,412,000 470,5tO 16,100,000 .. <br /> Total Allocation :~ <br /> , ~ <br /> ), <br /> " <br /> -.:; <br /> Note: (1) JUdgment decision indicates that value of benefit considered to at least ;\ <br /> equal alternative cost. '. <br /> (2) Alternative cost considered Justified on basis of Judgment. (Project , <br /> benefit cost 1.1 to 1.0) . .. <br /> " <br /> <br />'. . .... ":.' ',';. ,,-.'.'.~,,(.:....__..~..,,_,:':~,_:_..s......:,..':,, ..: ",.,_,~;",,,,_-,,,. .._~ ,........... . <br />