Laserfiche WebLink
<br />~ portion of the power transmission line will be constructed within <br />o <br />00 existing levee rights-of-way. Additional transmission line rights-of-way <br />W <br />will be on existing Reclamation-withdrawn lands or be within rights-of-way <br />required for the pipeline and well sites. The access roads to the Yuma Mesa <br />wells will be located on pipeline rights-of-way and have a width of about <br />20 feet. Existing roads will be utilized for access to the Yuma Valley wells. <br /> <br />Table 1 <br /> <br />Approximate Acreage Requirements for Rights-of-Way of <br />Protective and Regulatory Pumping Facilities <br /> <br />Yuma r~sa Boundary Well Field: <br /> <br />Acres <br /> <br />Federa 1 and State Lands (Oesertshrub): <br />Well Plots 3 <br />Pipeline (of which about 35 required <br />for access roads) 69 <br />i'l <br /> <br /> Private Land (Cultivated-citrus groves) : <br /> Well Plots 1 <br /> Pipeline 5 <br /> b <br /> Total Yuma Mesa 7B <br />Yuma Valley Boundary Well Field: <br /> Acres <br /> Private Land (Cultivated-misc. crops) : <br /> Well Plots 2 <br /> Pipeline 25 <br /> Total Yuma Valley 27 <br /> Total Acreage 105 <br /> <br />9 <br />