Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />OD1480 <br /> <br />TA8LE OF CONTENTS <br /> <br />1.0 Introduction. . <br /> <br />2.0 Soil Suitability <br /> <br />3.0 Land Clearing and Preparation. <br /> <br />4.0 Farm Efficiency Adjustments. . <br /> <br />5.0 Results of Level 8 Analysis <br />for the San Juan West Watershed. <br /> <br />6.0 Conclusions. . . . <br /> <br />APPENDIX A Estimation of Clearing and Grubbing Costs <br />APPENDIX B Revised Crop 8udgets for the San Juan West Watershed <br /> <br />LIST OF TABLES <br /> <br />Table 3-1 Estimated Canopy and 8rush <br />Removal Costs by Land Category . . . . . . . . . . .. 4 <br /> <br />Table 5-1 Level B Economic Analysis <br />San Juan West Watershed. . . . <br /> <br />. . . . . <br /> <br />Table 8-1 Net Returns Analysis for a 204 Acre <br />Operation in the San Juan West Watershed <br /> <br />1 <br />2 <br />2 <br />5 <br /> <br />5 <br />8 <br /> <br />7 <br /> <br />. , . <br />