Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />II <br />I <br />I <br />I <br />I <br /> <br />OD1488 <br /> <br /> <br />proximity to these parcels, no economies of scale could be achieved by <br /> <br /> <br />incorporating them into an existing operation. Thus, a revised set of <br /> <br /> <br />crop budgets for a 204 acre corn and soybean crop rotation was <br /> <br /> <br />developed. <br /> <br />The details of the crop budget analysis for Parcels SW76, SW81 <br /> <br /> <br />and SW82 are described in Appendix 8 to this report. A summary of the <br /> <br /> <br />results is given in the farm efficiency adjustment column of Table <br /> <br /> <br />5-1. That column shows that farming the three parcels as a 204 acre <br /> <br /> <br />unit would decrease repayment capacity by $55.00 per acre from the <br /> <br /> <br />level that could be achieved with a 1000 acre operation. The last <br /> <br /> <br />column of Table 5-1 shows adjusted residual repayment capacity for <br /> <br /> <br />each parcel after subtracting both land clearing charges and the farm <br /> <br /> <br />efficiency adjustment from residual repayment capacity. The results <br /> <br /> <br />show that Parcel SW76, consisting of approximately 100 acres, should <br /> <br /> <br />be dropped from consideration as potential PIA because its adjusted <br /> <br /> <br />residual repayment capacity is negative. Parcels SW81 and SW82, <br /> <br /> <br />however, still qualify as potential PIA after the Level B economic <br /> <br /> <br />analysis. <br /> <br />6.0 Conclusions <br /> <br /> <br />The preliminary analysis of potentially irrigable parcels in the <br /> <br /> <br />San Juan West Watershed resulted in the elimination of one parcel, <br /> <br /> <br />SW76, as potential PIA. The Level B economic analysis of two other <br /> <br /> <br />parcels totaling 104 acres, did not eliminate them from further <br /> <br /> <br />consideration. Prior to finalizing recommendations for these parcels, <br /> <br /> <br />an on-site inspection should be made to verify individual parcel <br /> <br /> <br />characteristics. <br /> <br />8 <br />