My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP10896
CWCB
>
Water Supply Protection
>
Backfile
>
10001-10999
>
WSP10896
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 3:15:08 PM
Creation date
10/12/2006 4:35:30 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8200.400
Description
Colorado River Basin - Briefing Documents-History-Correspondence
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
3/28/1945
Author
CWCB
Title
Statement of State of Colorado by CWCB - Concerning Report on Colorado River Basin in Preparation by BOR
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />oonH2 <br /> <br />-23- <br /> <br />River Compact upon the States of the Upper Division, it follows that the <br />said initial list of Upper Basin projects can be authorized and construct- <br />ed without danger of violating the said delivery obligation, and without <br />requiring the construction of any of the potential main-stem pov.er, regula- <br />tion or replacement reservoirs listed in the Report. Colorado sugGests <br />that the Report be amended to include the analyses and conunents above out- <br />lined. In connection with said initial list of projeots, it should be <br />noted that Colorado has approved the plans of the Little Snake Project only <br />to that first stage of its development which is presently needed, and can- <br />not now approve the plan for full or ultimate development; and Colorado <br />suggests that the potential San Juan-Chame. diversion project be excluded <br />from said initial list of projects and not be considered until such time <br />as investigations p~rmit selections to be me.de by New Mexico; and that an <br />agreement with Colorado will be necessary at that time. <br /> <br />~, <br /> <br />. <br /> <br />41. Total depletions of all potential Upper Basin irrigation projects <br />listed in the Report are estimated t herein at 1.851,000 aore feet annually. <br />Independent estimates by Colorado engineers arrive at substantially the <br />same total for the entire Upper Basin, but disclose rather wide discrep- <br />ancies when the estimated depletions are segregated by Sta.tes, as indicat- <br />ed in the following table. <br /> <br />New <br />Lands <br /> <br />Arizona <br />Colorado <br />NeVI Nexico <br />Utah <br />1:yoming <br /> <br />18,680 <br />471,300 <br />149 .960 <br />168 ,780 <br />291,330 <br /> <br />Upper Basin Totals <br /> <br />1,100,050 <br /> <br />I <br /> <br />Estim~ted Deplet~ons_.~ <br />Potential Upper Basin_ Irrigation <br />Projects Listed in Report <br /> <br />Acres Benefited <br /> <br />Es~~-p~pl_e.!'.?-~ <br /> <br />Ac re Feet <br />U.S.a.R. C.H.C.B. <br /> <br />Supp le- <br />mental <br /> <br />Total <br /> <br />6,000 <br />192,700 <br />15,100 <br />161,160 <br />95,360 <br /> <br />470,320 <br /> <br />24,680 <br />664,000 <br />165,060 <br />329,940 <br />386.690 <br /> <br />39,000 <br />788,000 <br />291,000 <br />319,000 <br />422,000 <br /> <br />39,000 <br />918 ,000 <br />300 ,000 <br />288,000 <br />298,000 <br /> <br />1,570,370 <br /> <br />1,851,000 <br /> <br />1,059,000 <br /> <br />Unit rates e.-nployed bj- tho Bureau of Rae le.matioll in estimating <br />the depletions of puoential projects are not disclosed in the Report. Es- <br />timates of Colorado engineers are based on rates believed to be ap~lica- <br />ble under the natural conditions prevailing in the Upper Basin and the <br />States thereof. Colorado suggests that details of depletion calculations <br />should appear in the Report; and says that the above depleticns do not <br />fully reflect all the opportunities and possibilities for future develop- <br />ment in Colorado, and probably in other States of the Upper ~vision, that <br />are to be anticipated in the next several decades. In addition to exist- <br />ing depletions of lands irrigate d in the Upper Basin. to the allowances <br />for future depletions by projects now authorized or under construction, <br /> <br />. <br />
The URL can be used to link to this page
Your browser does not support the video tag.