Laserfiche WebLink
<br />:,7'') Artesi.. wells will be spaced at quarter-mile :lJaterva1s aloll8 tlle <br />,:;,,' clwmel aad their, now discharged 1JI.to the chaoel through. diSCharge <br />boxes.' , , <br /> <br />fie estimated cO,sts of cOllStructilllg the contemplated <br />facilities are as shOWJl ,1JI. Table 3. <br /> <br />~able 3. Estimated, COllStructioll costs _, Jru.sea f S Bluf'f Area <br /> <br />, <br />No costs are es1(imated for lImds and rights as the facilities will <br />probably" be eatirely" w.l.thb. the area to be acquired for tl1e potential <br />Ala.mosaNatioaal Wildlife Refuge. <br /> <br />Excavation - 289,000 cu. yds. @ $O.25/cu. yd. <br /> <br />7 fam bridges @ $4,500 each <br /> <br />14 fence crossings ,@ $100 each <br /> <br />7 miles access roadS @ $:1.,000 each <br /> <br />7 miles access road surraciJag @ $500/mUe <br /> <br />28artesiaa wells 6" x 2,500 · @ "$.12,500 each <br /> <br />28 discharge boxes ad well eOJllleetiOlllS @ $80 eaell <br /> <br />SUbtotal <br />COIIlt:f.age:ades 25'/.":!: <br />Field' cost . <br />Eng1Jl.eering, superviSion ad otJi!.er costs 35'/.~:!: <br /> <br />$ 72,250 <br /> 31,500 <br /> 1,400 <br /> 7,000 <br /> 3,500 <br /> 35El,OOO <br /> 2.240 <br />* lK)7,890 <br />$ llJ,IlO <br />58 ,000 <br /> 205,000 <br />$ 790,000 <br /> <br />'lotal estimated cost <br /> <br />Estimated aM&.i Costs <br /> <br />fl1e estimated atmual 0DIlllR costs are as follows: <br /> <br />Jra1JI.tell8Jl.ce of 1 ,miles of en......'!l1 @ $SO/mile per year <br /> <br />Replacemea.t of wells, J.O~ - 40 years <br /> <br />Replacement of tam. bridges, fe.aee crossings, ad roM <br />s1U'facing, 25'/. - 25 years <br /> <br />Rounded <br /> <br />$ 560 <br /> 15,000 <br /> 615 <br />$ 16,175 <br />$ 16,000 <br /> <br />Allaual, om&R costs <br /> <br />~ c., <br /> <br />This facilitY" would be operated 1JI. eOllljuaction with tlle Closed <br />:Bas1Jl. wrks ad 1JI.tegrated with. that program. . ,_ <br />C= :'uJ <br /> <br />27 <br /> <br />.Riv. 10-29-64' <br />