Laserfiche WebLink
<br /> BLUE RIVER PROJECT OPERA TlONS 0 <br /> WATER YEAR 1999 <.:;) <br /> C <br />TRANSMOUNTAIN EXCHANGE DELIVERIES TO THE COLORADO SPRINGS POTABLE SYSTEM tn <br />'..I <br /> TABLE 2.1 -.I <br /> ACRE FEET <br /> (1) (2) (3) (4) (5) (6) (7) (8) (9) <br /> BLUE TWIN COLORADO C.U. TOTAL TOTAL TOTAL <br /> RIVER HOMESTAKE LAKES FRY-ARK CANAL TQ-CFI TRANSMTN TRANSMTN IMPORTED <br />MONTH EXCHANGE EXCHANGE EXCHANGE EXCHANGE EXCHANGE EXCHANGE EXCHANGE &CHEROKEE TO SYSTEM <br />OCTOBER 0 0 0 0 0 0 0 5,416 5,416 <br />NOVEMBER 0 0 0 0 0 0 0 2,965 2,965 <br />DECEMBER 0 0 0 0 0 0 0 3,783 3,783 <br />JANUARY 0 0 0 0 0 0 0 3,556 3,556 <br />FEBRUARY 0 0 28 0 15 0 43 3,568 3,611 <br />MARCH 0 0 0 0 0 0 0 4,295 4,295 <br />APRIL 0 0 0 0 0 0 0 3,934 3,934 <br />MAY 0 0 0 0 0 0 0 5,494 5,494 <br />JUNE 0 0 6,555 0 0 0 6,555 696 7,251 <br />JULY 0 0 0 0 0 0 0 8,891 8,891 <br />AUGUST 0 0 0 0 0 0 0 6,541 6,541 <br />SEPTEMBER 0 3,119 0 0 0 0 3,119 3,593 6,712 <br />. <br />TOTALS 0 3,119 6,583 0 15 0 9,717 52,7a2 62,449 <br /> <br />