Laserfiche WebLink
<br /> BLUE RIVER PROJECT OPERA TIONS 0 <br /> WATER YEAR 1999 C> <br /> Co">' <br />COLORADO SPRINGS 1948 BLUE RIVER RETURN FLOWS 0.. <br /> TABLE 5 03 <br /> W <br /> ACRE FEET <br /> (1) (2) (3) (4) (5) <br /> NET TRIB TO NEr COLa COLa SPGS 1948 ro 1948 <br /> WASTEWATER SPRINGS PERCENT POTABLE RETURN <br />MONTH PLANT INFLUENT RETURN SYSTEM FLOWS <br />OCTOBER 6.619 4.032 60.916 858 523 <br />NOVEMBER 4.314 3.778 87.575 60 53 <br />DECEMBER 4.290 3.800 88.578 768 680 <br />JANUARY 4.244 3.774 88.926 949 844 <br />FEBRUARY 4.216 3.326 78.890 909 717 <br />MARCH 5.232 3.641 69.591 862 600 <br />APRIL 4.980 3.837 77.048 644 496 <br />MAY 7.530 4.642 61.647 502 309 <br />JUNE 9.356 4.362 46.622 0 0 <br />JULY 11.242 4,406 39.192 572 224 <br />AUGUST . 8,496 4.847 57.050 587 335 <br />SEPTEMBER 8.978 4.219 46.993 3,593 1,688 <br />TOTALS 79,497 48,664 61 10,304 6,469 <br /> <br />{; <br />