Laserfiche WebLink
<br />SUMMARY SHEETS (Continued) <br /> <br />000156 <br />ESTIMATED COSTS <br /> <br />Construction costs (January 1977 prices) <br />Salinity control <br />Brine well field. . . . . . . . . <br />Hydrogen sulfide stripping plant. <br />Brine pipeline. . . . . . . . . . <br />Brine pipeline pumping plants . . <br />Radium Dam, Dike, and Evaporation Pond. <br />Transmission lines and substations. <br />Permanent operating facilities. . <br />Operation and maintenance housing <br />Capitalized movable equipment <br />Service facilities. . . . . <br />Depreciation and salvage. . <br />Investigations (Reclamation fund) <br />Wildlife mitigation . . <br />Subtotal . . . . . <br />Cultural resource program. <br />Total. . . . . . . <br />Annual equivalent cost of construction. <br />Annual operation, maintenance, and replacement <br />costs (1974-76 prices). . . . . . . . . . . . <br />Total annual costs . . . . . . . . . <br />Annual equivalent cost per mgll of net salinity <br />decrease at Imperial Dam. . . . . . . . . . . <br /> <br />COST ALLOCATIONS (lOO-year period at 5 5/8 percent interest) <br /> <br />Construction <br />costs <br /> <br />Reimbursable costs <br />Salinity control facilities <br />Nonreimbursable costs <br />Salinity control facilities <br />Cultural resource program <br />Subtotal <br />Total <br /> <br />$12,595,000 <br /> <br />37,786,000 <br />9,000 <br />37,795,000 <br />50,390,000 <br /> <br />.,~.; <br /> <br />2 <br /> <br />$1,900,000 <br />2,300,000 <br />5,900,000 <br />4,800,000 <br />33,000,000 <br />590,000 <br />175,000 <br />390,000 <br />1,010,000 <br />820,000 <br />-1,570,000 <br />456,000 <br />610,000 <br />50,381,000 <br />9,000 <br />50,390,000 <br />3,175,000 <br /> <br />332,300 <br />3,507,300 <br /> <br />192,700 <br /> <br />Annual <br />operation, <br />maintenance, <br />and replace- <br />ment costs <br /> <br />$84,600 <br /> <br />247,700 <br /> <br />247,700 <br />332,300 <br />