Laserfiche WebLink
<br />',' <br /> <br />FIGURES (Continued) <br /> <br />Number <br />21 <br />22 <br />23 <br />24 <br />25 <br />26 <br /> <br />Sodium and chloride pickup between gaging stations. <br />Test well installation. . . . . . . . . . <br />Typical monitoring well installation. . . <br />Radium Evaporation Pond and blanketing area <br />Radium Reservoir design annual inflow <br />Radium Reservoir inflow design flood. . . . <br /> <br />Page <br />49 <br />61 <br />63 <br />69 <br />70 <br />71 <br /> <br />MAPS <br /> <br />Paradox Valley Unit General Map (1294-400-24) <br />General Investigations Map (1294-400-21). . <br />Surface of gypsum breccia (1294-400-22) . . . <br />Water and piezometric levels (1294-400-23). . <br />Radium Evaporation Pond, drill hole location (1294-400-25). <br /> <br />P~ <br />Frontispiece <br />13 <br />31 <br />35 <br />39 <br /> <br />000162 <br /> <br />'.:i <br /> <br />iv <br />