Laserfiche WebLink
<br />0) <br />00 <br />C\1 <br />N <br /> <br />INTRODUCTION AND SUMMARY <br /> <br />This progress report has been prepared by the Bureau of Reclamation <br />to inform interested persons about the status of the current investiga- <br />tion of the Yellow Jacket Project in northwestern Colorado and to solicit <br />more public involvement in the planning process. Because of the broad par- <br />ticipation on the planning team and the controversial problems that have <br />beset the project for many years, a unified document is needed to summar- <br />ize what has been accomplished to date, what data are avatl~~le, and what <br />courses of future action are open. This is such a document., It is not <br />, <br />intended as a final project report, but rather a toolt~,<beus;d i~ fur- <br />ther planning. A description of the project area is p~ente~~ includ- <br />ing physical, biological, social, and economic factors.' The problems and <br />,h - . <br />needs of the area, as they involve water resource des.llelopment ,are. 'dis- <br />cussed. Data compiled through previous investigati6~&'are utilized ~here , <br />applicable. Six alternative plans have been developed. These are ~iefly <br />described in Chapter IV and numerical comparisons are summarized infChap- <br />ter V. <br /> <br />~ <br />I' s' <br />In the study of alternatives, nine potential reservoir sites were · <br />considered by the MOP team. Three are on the White River, one:~s an Milk <br />Creek, and the remaining five are on tributaries of the White River . ., <br /> <br />,1;" <br />;/" <br /> <br />" <br />< <br />t' <br /> <br />( <br />, <br /> <br />The six alternative plans cover a range of assumptions varying from a <br />modest level of development to one that is quite substantial. Both Fed- <br />eral and private participation are included. The relative emphasis an <br />each future water use was considered and uncertainties were recognized. <br />Far example, oil shale development appears to be imminent but could be de- <br />layed by any of several reasons. Development of coal resources far energy <br />might therefore be accelerated to help satisfy the immediate energy needs, <br />or coal and oil shale resources in the project area could be developed con- <br />currently. Agricultural production seems to be gaining in National impor- <br />tance and its priority could become much higher. An attempt was made to <br />provide for these uncertainties in selecting the plans far analysis. <br /> <br />Full consideration was given to widely divergent viewpoints and plan- <br />ning priorities of the MOP team members. New irrigation of land, for in- <br />stance, is apposed by wildlife interests, while the Yellow Jacket Conserv- <br />ancy District--which holds the key water rights in the area--strongly rec- <br />ommends maximum irrigation development. <br /> <br />General environmental concerns are presented in this report for each <br />alternative presented, and ideas on enhancement of natural resources and <br />mitigation of potential lasses are included. The analyses are of a gen- <br />eral nature at this preliminary stage of project planning, particularly <br />considering that few details on use of project industrial water are avail- <br />able. Because of this, impacts of the use of water for coal and oil shale <br />development are not addressed. <br />