My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP10819
CWCB
>
Water Supply Protection
>
Backfile
>
10001-10999
>
WSP10819
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 3:14:50 PM
Creation date
10/12/2006 4:33:58 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8541
Description
San Luis Valley Project
State
CO
Basin
Rio Grande
Water Division
3
Date
1/1/1950
Title
Monthly Progress Report
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />.......~., ~ <br /> <br />. <br /> <br />. <br /> <br />lREClEliV <br /> <br />.' <br /> <br />~~. "/, <br />'/\,1. .~i' h,v:x, 1/ <br />.,.r., " <br />r ,,:' t/.... <br /> <br />)l)lI!BI.Y Pil)IUSS BlIPORf <br />SA.B LUIS TALLm' PROnCT, COLOlWlO <br />REGIOJ! T <br /> <br />fER <br /> <br />C'l ~(lj'" <br />C L'C- <br /> <br />Jlonth of Janua17. 1950 <br /> <br />COLORADO W <br />COMSBt"ATlON <br /> <br />R10 Grande DiY1~on <br /> <br />Land classification, field and office work was contiuued during the <br />month wUh no Ulle lIeing lost due to inclement weather. <br /> <br />All field note. (profile. and croee-section.) of the flood plain of <br />the R10 Grande were ...::ptotted and the -.terial was _11sd to the Corps <br />of llDgineers, .Allruquerque. <br /> <br />Field work cons1BtiDg of crosB-secUons, profUes, photographe and <br />gatherbg of rec>>-col,blee froll a square l'ard of each designated clUl&l was <br />OOlllpleted for the special canal studies. Thie _terial will 'be plotte" <br />in the office and the 88IllPleS will lie sent to Denver technical eecUon. <br />It 18 anticipated that this _terial will aid in future canal design. <br /> <br />.All field notee on the proposed power dam a1 te. a)on Wagon Wheel <br />Gap DIllle1 te wer8 c~'led.j An ed1lllator wa. requested froll the Chief <br />IDgineer'e>>enver office to aid in ietermining which power sU.s sho1ild <br />be given further studT. <br /> <br />lluring the IIOnth, the San Luis Tallel' Water Conaerv8JlC7 District <br />continued an active C8Ilp&1gn to extend the bo1Uld&ri.s of the Diatrict. <br />Sat1lfacto17 progr8ea h reported. ' <br /> <br />Wem1J1Uche 'as. Diddcn <br /> <br />!here were. no activities during the IIOnth in this diddon. <br />Closed llaSinDrain Division <br /> <br />, Ollsenation of the fiuctus.tlOns of the ground. water 1.....1 continued <br />during the month b;v personnel of the lJ. S. Geological Survq. <br /> <br />CoDBjOS Divieion - Platoro UBit <br /> <br />COl\l8tnction work ceased last IIOnth, .All field personnel were de- <br />tailed to other prejech. Office persouel were engaged in routine office <br />work. <br /> <br />General <br /> <br />kcellent wsather conditions prevail.d cb1ring the 110.' of the 1I0nth <br />except in the high altitudes. <br />!he fuad situation 11 extrelD811' critical on th1eprj)~cn';.tl. 01... <br />supplemental fwlds .ecome available at an early date, itu1'e"en"tlrelr <br />possi'ble that all actidUe. of the San Luis ValleT Project will Deed to <br />bee di.continued. <br />
The URL can be used to link to this page
Your browser does not support the video tag.