My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP10818
CWCB
>
Water Supply Protection
>
Backfile
>
10001-10999
>
WSP10818
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/28/2009 11:12:01 PM
Creation date
10/12/2006 4:33:57 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8407.500
Description
Platte River Basin-River Basin General Publications-Missouri River General Publications
Date
10/25/1974
Author
MRBC
Title
1975 Water Assessment-Missouri River Basin-Memorandum of Agreement Between the Missouri River Basin Commission and the US Water Resources Council 3
Water Supply Pro - Doc Type
Operating Principles/Plan
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />\ <br />I <br /> Activity - <br /> Subactivit Pa rti ci ants <br /> Group A <br /> Overview <br /> Committee <br /> Subactivity Nineteen -- Establ ish Group ^ <br /> Priorities <br /> MRBC Staff <br /> Overview <br /> Commi ttee and <br /> MRBC <br /> Subactivity Twenty -- Prepare the ~1RBC Staff <br /> State/Regional <br /> Report <br /> Overview <br /> I Committee <br /> N <br /> <n <br /> I <br /> Subactivity Twenty-One -- Regionwide Group B <br /> Review of <br />, the State/ <br /> Regional <br /> Report <br /> MRBC Staff <br /> Subactivity Twenty-Two -- Final MRBC Staff <br /> Spec ifi c <br /> Problem <br /> Analysis <br /> Report <br /> MRBC <br /> <br />Desi nated Res onsibilit <br /> <br />Review and supplement staff results of subactivity seventeen. <br />,Review and endorse the results of subactivity seventeen. <br /> <br />Establish and document a set of priorities by time frame <br />(1975-1985 and 1985-2000) for Level B, special, Level C, and <br />implementation studies. <br /> <br />Compile and document the results from Group A. <br /> <br />The overview committee submits the priority listings from <br />subactivity eighteen to the Missouri River Basin Commission <br />for endorsement. <br /> <br />Prepare the State/Regional report. <br /> <br />Review of the State/Regional report. <br /> <br />Review and comment on the State/Regional report. <br /> <br />Document the results of the regionwide review. <br />Prepare the final Specific Problem Analysis Report. <br /> <br />Revi ew and endorse the fi na 1 report and transmi t it to WRC, <br />regional participants and others as appropriate. <br /> <br />~ i .,. ': ~-:: . <br />135&':' <br />I. -'" <br /> <br />II <br />
The URL can be used to link to this page
Your browser does not support the video tag.