My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP10809
CWCB
>
Water Supply Protection
>
Backfile
>
10001-10999
>
WSP10809
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 3:14:49 PM
Creation date
10/12/2006 4:32:48 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8273.500
Description
Colorado River Basin Salinity Control - Federal Agency Reports - EPA
Basin
Colorado Mainstem
Water Division
5
Date
4/1/1978
Title
Integrating Desalination and Agricultural Salinity Control Alternatives
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
195
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br /> <br />N 6 S 14 <br />00 FCR l: C' . + I l: C' . + l: C' . \"\ <br />tv C l r l l <br />Ul pw = i=l i=7 i=9 ...'..,..... (45) .~,~ <br /> 3.65x10-4 " <br /> C x Uf x , . ~"( <br /> P <br /> 6 S 14 <br /> FCR l: C' , + I l: C' . + l: C' . <br /> Cs l r l l <br /> = i=l i=7 i=9 ................ (46) <br /> -4 <br /> Cb x Cbo x Uf x 3.65xlO <br /> <br />in which, <br /> C = <br /> pw <br /> C = <br /> s <br /> C! = <br /> l <br /> <br />C = <br /> P <br />Cb - <br />Cbo - <br />FCR = <br />I = <br /> r <br />Uf - <br /> <br />unit cost of product water, $/m3; <br />unit cost of brine salts, $/metric ton; <br />total annual cost for element i, $/year <br />(feedwater + plant + brine) (Ci = construction <br />cost, C'2 = steam generation, C'3 = site <br />development, C'4 = interest during construction, <br />C'5 = start-up costs, C'6 owner's general expense, <br />C'7 = land, C'S = working capital, C'9 = labor <br />and materials, C'10 = chemicals, C'll = fuel, <br />C'12 = electrical, C'13 = steam generation 0 & M, <br />and, C'14 = replacement.) <br />product water volume, m3/day; <br />brine volume, m3/day; <br />TDS concentration in brine, mg/~; <br />fixed charge rate; <br />interest rate; and <br />use factor - fraction of total time in actual <br />operation, <br /> <br />The r~sults from the desalting cost model indicate that unit <br />costs as described in Eqs. 45 and 46 for either water or salt <br />production are highly affected by plant capacity (scale effects). <br />For example, a hypothetical reverse osmosis system desalting <br />feedwater at 4000 mg/~ to produce product water at 500 mg/~ <br />would have cost characteristics as illustrated in Figure 2. <br />These data are based on feedwater wells approximately one kilo- <br />meter from the plant site and brine injection wells at the site. <br />Interest, fuel, and electrical costs are those used by U. S. <br />Department of the Interior (1972). <br /> <br />27 <br /> <br />"j <br /> <br />': <br /> <br />"4 <br />"\ <br /> <br />; <br />j <br /> <br />if <br />, <br /> <br />;0 <br />~~ <br />j <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.