My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP10800
CWCB
>
Water Supply Protection
>
Backfile
>
10001-10999
>
WSP10800
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 3:14:46 PM
Creation date
10/12/2006 4:32:35 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8277.200.10
Description
California's Central Valley Project
State
CA
Basin
Colorado Mainstem
Date
1/1/2000
Title
Western Water -- Central Valley Project Improvement Act Update
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />o <br />l...'? <br /> <br />I....) <br /> <br />N <br />o <br />illY <br /> <br />I <br /> <br />~ <br /> <br />II <br /> <br />I <br />I <br /> <br />I <br /> <br />the Delta receives water from both <br />projects. "I don't think the state <br />anticipated that result." <br />In late January, a joint legislative <br />hearing was convened by the state <br />Senate's Agriculture and Water <br />Resources and Assembly's Water, Parks <br />and Wildlife committees to discuss the <br />water quality crisis. At the hearing, <br />state legislators questioned federal and <br />state officials on the developments in <br />December while <br />stakeholders rook <br />advantage of the <br />opportunity to <br />sOllnd off on b2, <br />and the Bureau's <br />projected water <br />allocations. <br />Wcstlands <br />farmer Chris <br />Heard told <br />legislators hc will <br />have to fallow 700 <br />of the 2,100 acres <br />he farms if the <br />Bureau's water <br />allocation stands. <br />"We do not have other surface or well <br />water available," he said. "h..1y farm is <br />not sustainable with a 40 percent <br />supply." <br />Countered Zeke Grader, executive <br />director of the Pacific Coast Feclera~ <br />tion of Fishermen's Associations <br />(PCFFA), "North coast salmon ports <br />have had boats rotting in the slips for <br />years because we have not had ad; <br />equate water in the streams. The <br />problem is not with the fish, with the <br />Endangered Species Act, or the <br />CVPlA, the problem is we have a <br />water system that is over subscribed." <br />This issue of Western Water <br />provides an update on the CVPIA, <br />with a particular focus on the issues <br />surrounding the b2 water, contract <br />renewals, Trinity River flows, and the <br />link between the CVPIA and the <br />CALFED Bay,Delta Program. Addi, <br />tional background information on the <br />CVP and the CVPIA can be found in <br />the Foundation's Laypenon's Guide to <br />the Central Valley Project and back <br />issues of Western Water. <br /> <br /> <br />Q <br /> <br />The b2 Water <br />Section 3406(b)(2) of the CVPIA <br />requires that Interior "dedicate and <br />manage annually 800,000 acre,feet of <br />CVP yield" for uses such as instream <br />flows for fish. As defined in that <br />section, CVP yield "means the deliv; <br />ery capability of the CVP during the <br />1928, I 934 drought period after fishery, <br />water quality and other flow and <br />operational requirements ... existing at <br />the time of enactment" have been <br />met. The law did not, however, spell <br />out how much of the water was to be <br />used upstream of the Delta, how much <br />was to be used on which river system, <br />or how much - if any - was allowed to <br />be captured for export downstream <br />after it had been Llsed upstream for <br />environmental purposes. <br />In 1997, after a two~year, mlllti~ <br />stakeholder consensus process led by <br />then Deputy Secretary John <br />Garamendi, Interior released its b2 <br />proposal. The plan did not include a <br />strict interpretation of yield nor a <br />method to account for water used. <br />Insteadl the focus was on specific fish <br />actions such as increased instream <br />flows and decreased pumping at key <br />times of the year; in some years more <br />than 800,000 acre,feet would he used, <br />in some years less. <br />One day after the plan's releasel <br />the San Luis & Delta,Mendota Water <br />Authority filed suit, arguing that the <br />water be accounted fat. They also <br />argued that the statute required <br />Interior to use the "delivery capability <br />of the CVP during the 1928, I 934 <br />droughe' to develop an accounting <br />plan - in whICh case, the 800,000 <br />acre,feer already had bccn used to <br />meet the CVP's obligations under the <br />Bay'Delta Accord, Endangered <br />Species Act and Delta water quality <br />control plan. <br />Enviromnentalists ultimately <br />joined the suitl arguing that Interior <br />must distinguish between dedicated <br />yield and project re~operation - <br />modifications that don't affect deliver; <br />ies - and actual supply reductions; that <br />800,000 acre' feet of yield equals an <br />800,000 acre,feet cut in watet supplies. <br /> <br />~estern ~ater <br />
The URL can be used to link to this page
Your browser does not support the video tag.