My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP10784
CWCB
>
Water Supply Protection
>
Backfile
>
10001-10999
>
WSP10784
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 3:14:41 PM
Creation date
10/12/2006 4:31:57 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.200.05.R
Description
Hoover Dam/Lake Mead/Boulder Canyon Project
Basin
Colorado Mainstem
Date
7/1/1939
Title
Statement Concerning Negotiations Regarding Boulder Dam Energy Rates
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />en <br />cc <br /> <br />-7.. <br /> <br />"" <br />.... <br />e.' <br /> <br />At the aame time the Metropolitan Distriot opposed in <br /> <br />prinoiple the offer end demands ot' the Bureau ot' Power and Lip,ht. <br /> <br />,... <br />- <br /> <br />By the t:lJlle of a. oonference held in SlUtta .Fe, Naw Menoo, <br /> <br />Maroh 17 and lS, 19311, there hl!d been con9ider~ble change in the <br /> <br />tOl!ll of the proposal due to nllGot1ation betl"een re'.flreaentntivea of <br /> <br />the Bureau of Power and Light end Nathan,.R. Mar;told, ::'olie1tor <br /> <br />of the Department of th'l Interior, e.n-J ,,,'1116 t:u)re wt119.11ttle lH'Ogregs <br /> <br />Illade at this conference, proposals were auhroltted shortlY" a:l'terwcrd <br /> <br />which provided <br /> <br />1) that the Bureau would oonstl'l.1ct a third trl'.ll51lission <br />c1reuit; <br /> <br />2) take additional energy in the following lIlOunhl <br /> <br />19:11-40 <br />1940-41 <br />1941-42 <br />1942-43 <br />1943-44 <br />1944-45 <br /> <br />385,000,000 lG1H <br />490,000.000 " <br />595,000.000 " <br />700,000,000 " <br />700,000,000 " <br />700.000.000, " <br /> <br />3) pay !.'or said energy at e ret.e of 9.50 mill~ per kllmmt.t <br />hour; <br /> <br />in return for which the Un1 ted statelS was asked <br /> <br />1) to prellerve in all future "djustments of' rates the ratio <br />between "ths rates of 1.63 :nille ',ld 0.50 mill/!: for the <br />privee of finT! and secondary energy; <br /> <br />2) extend the period for reps:yment for the generating <br />machinery to 50 year~ iust'sd of' 10 years; <br /> <br />;l) designate the Bureau as gener'ltlng ~.gent for the LOE <br />ilngelel! Gss and Electric Corporation {",nd extent1 the <br />three year "b'lild up" period to the contraot of thet <br />compe.ny (v.hich has been assigned to the Bureeu). <br /> <br />On the part of the lietropOl1tan District a proposal <br /> <br />'fIas made which provided thet the united States would <br /> <br />1) dei'er the beginnin.", of the contract period for the <br />District from June 1, 193$. to June 1, 1')40; <br />
The URL can be used to link to this page
Your browser does not support the video tag.