My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP10777
CWCB
>
Water Supply Protection
>
DayForward
>
1-1000
>
WSP10777
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/29/2009 8:52:05 PM
Creation date
10/12/2006 4:31:51 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8040.200
Description
Section D General Studies-Energy
Date
10/1/1976
Author
CWCB
Title
Delta Project
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />~ <br /> <br />PROPOSED PROJECT <br />Based upon both economy and conservation of water resources, the <br />consultant has recommended an interim solution of universal meter <br />installation and improvement of the existing treatment and distribution <br />system. The report concludes that the high capital investment required <br />for a significant addition to the raw water supply is not warranted at <br />this time, but will undoubtedly be required in the near future. <br />F~c~ 3 review of the report and consultation with officials of the <br />city of Delta, the staff of this board concludes (1) that the city of <br />Delta must initiate aggressive planning and a phased development of a <br />project leading to a major addition to the municipal raw water supply, <br />and (2) that the installation of impr~ved distribution facilities and <br />water meters should start as soon as funds can be made available. <br />The improvement of the existing system and the installation of <br />meters will cost approximately $900,000. The financing proposal is that <br />the Colorado Water Conservation Board construction fund construct half <br />of the project at a cost of $450,000 and that the remaining half be <br />constructed from funds derived through the sale of municipal bonds, <br />Under this proposal, this board would levy water use charges against <br />the city of Delta in the sum of $26,024 annually for a period of thirty <br />years, for a total charge of $780,720. <br />RZCO~mNDATION AND PRIORITY <br />The residents of the city of Delta are now under water use restric- <br />tions during the summer months. These restrictions will become more <br />severe with the passage of each year. A sufficient raw water supply <br />exists for the short term future,if the internal distribution system is <br />improved and water conservation methods are instituted. The pressing <br /> <br />-3- <br /> <br />0333 <br />
The URL can be used to link to this page
Your browser does not support the video tag.