My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP10727
CWCB
>
Water Supply Protection
>
Backfile
>
10001-10999
>
WSP10727
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 3:14:27 PM
Creation date
10/12/2006 4:29:13 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8510.100.60
Description
Rio Grande Compact Commission
Basin
Rio Grande
Water Division
3
Date
1/1/1971
Title
Report of the Rio Grande Compact Commission 1971
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />RECORDS OF DELIVERIES AND RELEASES <br /> <br /> <br />':'~;j <br />~;;:~~~1~~} <br /> <br />26 <br /> <br />RIO GRANDE CO~lPACT COMMISSION REPORT <br /> <br />.-. <br />It') <br />to <br />C") <br /> <br />At the annual meeting of the Compact Commission on April 20, 1972, <br />the records of deliveries and releases for calendar year 1971 were <br />examined and the computations of debits and credits based thereon were <br />reviewed. The records and computations as reviewed by the Commission <br />are reproduced on the next three pages. <br /> <br />[~. .) <br /> <br />The delivery of water in the Rio Grande at the Colorado-New Mexico <br />State line was obtained from record of streamflow near Lobatos, <br />Colorado; the obligation of Colorado to deliver water at the State line <br />was computed as prescribed in Article III. Item C5, the Reduction of <br />Debits prescribed in Article VI, was computed in accordance with the <br />Rules and Regulations. <br /> <br />1:-' <br /> <br />The delivery of water by New Mexico to Project Storage was <br />computed from the actual streamflow record and the record of operation <br />of Elephant Butte Reservoir; the scheduled delivery was computed as <br />prescribed in the Resolution of the Commission adopted at the Tenth <br />Annual Meeting, and published in this Report. Item NM~, Reduction of <br />Debits by Evaporation, was computed in accordance with the Rules and <br />Regulations. <br /> <br />The actual release from Project Storage during the year was <br />measured at stations below Caballo Dam. The Accrued Departure from <br />Normal Release is an under-release but is omitted in accordance with a <br />decision of the Comrrdssion at the meeting on February 15. 1968. <br /> <br />r'~"""~ <br /> <br /> <br />~<;:;f~; <br />c",,"j! <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />~t~::: .:~ <br />"'>~ ' <br />18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.