|
<br />The summer storage season began at 0001 hours April " 1992.
<br />Transfer of 36,275.20 acre-feet of winter conservation storage into the
<br />Section II accounts began on April " 1992 in accordance with the
<br />Operation Plan and was completed on April 17, 1992. Conservation
<br />storage operations are detailed in Table 5. During the period April 1 to
<br />18, 2,163.17 acre-feet of summer conservation storage was
<br />accumulated. After a reduction for evaporation this water was also
<br />distributed to the Section II accounts. Kansas received 40% of the
<br />April conservation storage transfers 115,236.05 acre-feet) and the
<br />Colorado District 67 ditches received 60% (22,854.11 acre-feet). a
<br />total of 38,090.16 acre-feet. With moderate runoff there were nO
<br />flood control operations during Compact Year 1992, as reflected in
<br />Table 5A, Flood Pool Operations. Peak contents in JMR of 70,800
<br />acre-feet was reached on April 4, 1992.
<br />
<br />During June, JuIV, and August 1992 brief periods of high runoff
<br />resulted in additional summer inflow of 4,499,97 acre-feet to
<br />conservation storage, After reduction for evaporation, 4,498,30 acre-
<br />feet was subsequently transferred to the Section II accounts, Kansas
<br />receiving 40% (1,799.32 acre-feet), and Colorado District 67 ditches
<br />60% 12,698.98 acre-feet). No other inflows to conservation storage
<br />occurred during the remainder of the year.
<br />
<br />TA8LE 5 JOHN MARTIN RESERVOIR
<br /> CONSERVATION STORAGE OPERATION IAFJ
<br /> COMPACT YEAR 1992
<br /> Contents Inflow to Storage Contents
<br />M2nIh Beain Month ~ EvaDoration ~ End Month
<br />Nov.'91 0,00 10,732,33 105,73 0,00 10,626,60
<br />Dec. 10,626.60 7,141.12 171.38 0,00 17.596,34
<br />Jan. '92 17,596,34 7,257,99 188,63 0,00 24.665,70
<br />Feb. 24,665,70 6,511.10 426,49 0,00 30,750,31
<br />Mar. 30,750,31 6,301. 78 776,89 0,00 36,275,20
<br />Winter Subtotal :::::~J:.:~1~r:~?::::::::jA~~:.:i:C::::::::::JLt?9.:
<br />Apr. 36.275,20 2,163.17 348,21 38,090,16 0,00
<br />May 0,00 0,00 0,00 0,00 0,00
<br />June 0,00 934,95 0,35 934,60 0,00
<br />July 0,00 1,442.18 0,67 1,441.51 0,00
<br />Aug. 0,00 2,122.84 0,65 2,122,19 0,00
<br />Sept. 0,00 0,00 0,00 0,00 0,00
<br />Oct, '92 0,00 0,00 0.00 0,00 0,00
<br />Summer Subtotal ::::::::$;:~~~;:i:L:::::::)1~:,:~~:::::1:H~~A~:
<br />Year Total 44,607.46 2,019,00 42.588.46
<br /> NOTES:
<br />(lJ Not 8 physical release from JMR. transferred to operating plan accounts.
<br />121 Source: Oper. Sec. 92 Report. Table I.
<br />
<br />15
<br />
<br />....~A '11:
<br />
|