My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP10686
CWCB
>
Water Supply Protection
>
Backfile
>
10001-10999
>
WSP10686
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 3:14:17 PM
Creation date
10/12/2006 4:27:49 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.115.E
Description
Florida Project
State
CO
Basin
San Juan/Dolores
Water Division
7
Date
11/1/1959
Author
USDOI-BOR
Title
Definite Plan Report - Florida Project Colorado
Water Supply Pro - Doc Type
Definite Plan Report
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />SUl<lMARY SHEETS (Continued) <br /> <br />COSTS <br /> <br />Construction costs (April 1959 prices) <br />Lemon Dam and Reservoir . . . . . . . . . . . . . <br />Florida Farmers Ditch Diversion Dam . . . . . . . <br />Florida Farmers Ditch enlargement ........ <br />Florida Canal enlargement . . . . . . . . . . . . <br />Laterals . . . .. . . . . . .. .. . 4: . . .. . . . . . <br />Rehabilitation and extension of existing ditches. <br />General property (fish screen) . . . . . . . . . . <br />Recreational facilities .... . . . . . . . . . <br />Total e_ . . . . . . . . . . . . . . . . . . . <br /> <br />Annual operation, maintenance, and replacement costs <br />(1956-58 prices) ................. <br /> <br />$9,610,000 <br />170,000 <br />450,000 <br />200,000 <br />310,000 <br />100,000 <br />30,000 <br />52,000 <br />10,922,000 <br /> <br />26,700 <br /> <br /> IRRIGATION <br /> Class 1 Class 2 Class 3 Total <br /> Irrigable area (acres) <br />. , Full service land 29 3,260 2,441 5,730 <br />'.-. " Supplemental service land m ~ 3,559 13,720 <br /> Total 12, 6,000 19,450 <br /> <br />Alfalfa, small grains, pasture, <br />and livestock, primarily beef <br />and dairy cattle <br />Average elevation of project area (feet msl) ....... <br />Average frost-free period (days) ............. <br />Annual consumptive use of irrigation ~Tater <br />(ac. -ft. :per ac.) . . . . . . . . . . . . . . . . . . . . <br />Annual farm delivery requirement (s.c. -ft. per s.c.) .... <br />Annual diversion requirement (ac. -ft. per ac.) <br />Above Florida Farmers Ditch . . . . . . . . . . . . .. 3.20 <br />Below Florida Farmers Ditch . . . . . . . . . . . . .. 1.21 <br />Florida Mesa.. . . . . . . . . . . . . . . . . . . . .. 2.81 <br />Average annual project supply (ac. -ft.) . . . . . . . . . . 25,740 <br />Average annual increase in Colorado River <br />depletions (ac. -ft.) ............... <br />Estimated date of delivery of project water . . . . . . . . <br />Repayment period after 5-year development <br />period (years) ..................... <br /> <br />Principal agricultural production: <br /> <br />6,800 <br />112 <br /> <br />1.23 <br />2.72 <br /> <br />. . . 13,900 <br />1964 <br /> <br />2 <br /> <br />50 <br />
The URL can be used to link to this page
Your browser does not support the video tag.