My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP10645
CWCB
>
Water Supply Protection
>
Backfile
>
10001-10999
>
WSP10645
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 3:14:04 PM
Creation date
10/12/2006 4:26:15 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.130.E
Description
West Divide Project
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
5/1/1982
Author
USDOI - BOR
Title
Planning Report on the West Divide Project - Colorado - May 1982 - Appendix B - Water Supply
Water Supply Pro - Doc Type
Definite Plan Report
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />00 <br />"'-"" <br />1"- <br />~ <br />C\l <br /> <br />Chapter IV <br /> <br />Chapter V <br /> <br />Chapter VI <br /> <br />CONTENTS (Continued) <br /> <br />Proj ect operation . . . . . . <br />Project plan of operation. <br />Divertible flow. . . <br />East Divide Creek <br />West Divide Creek <br />Beaver Creek. . . <br />Battlement Creek. <br />Without project operation study. <br />With project operation study <br />Kendig Reservoir and West Divide Canal <br />Service Area. . . . . . <br />East Divide Canal Service Area. <br />Hunter Mesa Canal Service Area. <br />Cache Creek Canal Service Area. <br />Dry Hollow Feeder Canal Service Area. <br />Dry Hollow Reservoir. <br />Reservoir sedimentation. <br />Reservoir evaporation. <br />Shortages. . . . . <br />Stream depletions. . <br />Return flows . <br />West Divide Canal Service <br />East Divide Creek Service <br />Cache Creek Canal Service <br />Hunter Mesa Canal Service <br />Feeder Canal Service Area <br />Proj ect sununary. . . . . <br />Reservoir seepage. . . . . . <br />Sizing of project features. . . <br />Kendig and Dry Hollow Reservoirs <br />Outlet works for Kendig and Dry Hollow <br />Reservoirs . . . . . . <br />Kendig Reservoir. . . . <br />Dry Hollow Reservoir. . <br />Canals and pumping plants. <br />Water quality . . . . . . . <br />Surface water quality. . . <br />Preproject conditions . <br />Colorado River near Silt <br />West Divide Creek. . . . <br />East Divide Creek near Mouth <br />Beaver Creek at USGS gage. . <br />Battlement Creek at old USGS gage. <br />Postproject conditions. <br />Reservoir quality. . . . <br />Kendig Reservoir. . . <br />Dry Hollow Reservoir. <br />Ground water quality . . . <br />Preproject condition. . . . <br />Postproject conditions. . . <br />Effects of project on Colorado River system. <br />Changes in salinity at Imperial Dam. . . . . <br /> <br />. . <br /> <br />Area. <br />Area. <br />Area. <br />Area. <br /> <br />ii <br /> <br />Page <br />26 <br />26 <br />27 <br />28 <br />28 <br />28 <br />29 <br />29 <br />29 <br /> <br />31 <br />31 <br />31 <br />31 <br />31 <br />32 <br />32 <br />32 <br />33 <br />36 <br />36 <br />37 <br />37 <br />37 <br />37 <br />37 <br />38 <br />38 <br />41 <br />41 <br /> <br />42 <br />42 <br />42 <br />42 <br />45 <br />45 <br />45 <br />45 <br />46 <br />47 <br />47 <br />47 <br />48 <br />48 <br />48 <br />49 <br />51 <br />51 <br />52 <br />52 <br />53 <br />
The URL can be used to link to this page
Your browser does not support the video tag.