My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP10645
CWCB
>
Water Supply Protection
>
Backfile
>
10001-10999
>
WSP10645
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 3:14:04 PM
Creation date
10/12/2006 4:26:15 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.130.E
Description
West Divide Project
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
5/1/1982
Author
USDOI - BOR
Title
Planning Report on the West Divide Project - Colorado - May 1982 - Appendix B - Water Supply
Water Supply Pro - Doc Type
Definite Plan Report
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />t=-:- <br /> <br />~ Planning Report <br />On The <br />west divide project <br />Colorado <br /> <br />MAY, 1982 <br /> <br />APPENDIX B <br />WATER SUPPLY <br /> <br />On May 18 1981. the nallle of the Water and PCJIf'er Resources Service was <br />changed to' its former name, the Bureau of Reclamation. All references to <br />the Water and Power llesources Sl!!rvice or any derivative. thereof should be <br />considered synonymous with the Bureau of Reclamation. <br /> <br />BUREAU OF RECLAMATION <br />Robert N. Broadbent, Commissioner <br /> <br />UPPER COLORADO REGION <br />Clifford I. Barrett, Regional Director <br /> <br /> <br />PREUMINARY <br />SUBJECll0 REVIS\ON <br /> <br /> <br />I <br />., <br />
The URL can be used to link to this page
Your browser does not support the video tag.