My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP10639
CWCB
>
Water Supply Protection
>
Backfile
>
10001-10999
>
WSP10639
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 3:14:02 PM
Creation date
10/12/2006 4:25:57 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8141.700
Description
Fryingpan-Arkansas Project - Annual Operating Plans and Reports
State
CO
Basin
Arkansas
Water Division
5
Date
10/1/2000
Author
US DoI BoR
Title
Annual Operating Plan Fryingpan-Arkansas Project Summary of Actual Operations Water Year 2000
Water Supply Pro - Doc Type
Annual Report
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
79
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />~Z4-) <br /> <br />ANNUAL OPERATING PLAN <br />FRYINGPAN-ARI<ANSAS PROJECT <br />WATER YEAR 2000 OPERATIONS <br /> <br />I. <br /> <br />GENERAL <br /> <br />This is the 32nd Annual Operating Plan for the Fryingpan-Arkansas Project (Project), The <br />Project, completed in 1990, imports spring snowmelt runoff from Colorado's West Slope <br />to the semi-arid Arkansas River Basin on Colorado's East Slope, The Project consists of <br />federally owned dams, reservoirs, stream diversion structures, conduits, tunnels, pumping <br />plants, a pumped-storage powerplant, electric transmission lines, substations, and <br />recreation facilities. These features are located in the Fryingpan River and Hunter Creek <br />watersheds of the upper Colorado River Basin, and in the Arkansas River Basin in central <br />and southeastern Colorado, The Project provides water for irrigation, municipal and <br />industrial use, hydroelectric power generation, recreation, and wildlife habitat. The <br />Project also provides for flood control. <br /> <br />The Project was authorized under Public Law 87-590 on August 16, 1962, This law <br />provides that the Project will be operated under the Operating Principles adopted by the <br />State of Colorado on April 30, 1959, CIS amended on December 30, 1959, and on <br />December 9,1960. These Operating Principles were published as House Document 130 <br />(87th Congress, 1st Session). <br /> <br />This Annual Operating Plan is a summary of the actual Project operation in water year <br />2000 <October I, 1999, through September 30, 2000). <br /> <br />I <br />l <br /> <br />II. PROJECT FEATURES IN OPERATION DURING WATER YEAR 2000 <br /> <br />Ruedi Dam and Reservoir are located on the Fryingpan River, a tributary of the Roaring <br />Fork River, on Colorado's West Slope about 13 miles east of Basalt, Colorado, Ruedi <br />Reservoir has a total capacity of 102,373 acre-feet at a water surface elevation of <br />7766.0 feet. The reservoir is operated on an annual cycle. Steady winter releases draft <br />the reservoir such that it is filled with the spring snowmelt runoff, while releases to the <br />Fryingpan River are maintained below the safe channel capacity, The reservoir provides <br />replacement water for out-of-priority depletions to the Colorado River by the Project as <br />well as water for West Slope irrigation, municipal, and industrial uses on a contractual <br />basis. The reservoir is also operated to provide for recreation, wildlife habitat, and flood <br />control. <br /> <br />The West Slope Collection System, located upstream of Ruedi Reservoir in the upper <br />Fryingpan River and Hunter Creek watersheds, is a series of 16 stream diversion <br />structures and eight tunnels. The system collects spring snowmelt runoff for diversion, by <br />gravity, to the inlet of the Charles H, .Boustead Tunnel (Boustead Tunnel). The Boustead <br /> <br />1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.