Laserfiche WebLink
<br /> Turquoise Lake <br /> Water Year 2000 Operations <br /> Unit: 1,000 Acre-Feet <br /> t......, <br /> I'i <br /> C~ <br /> Inflow L <br /> Busk-Ivanhoe Homestake Project Native Total Total End of Month Water Surface <br /> Imports Imports Imports Inflow Inflow Evap Outflow Content Elevation <br /> (FEET) <br /> Through Through <br />Year Month Carlton Boustead <br />1999 Sep 124,9 9866,86 <br /> Oct 0,1 0 0 0 0,9 1.0 0.4 5,3 120.2 9864,22 <br /> Nov 0 0 0 0 0 0 0,3 I.2 118,7 9863,35 <br /> Dec 0 0 0 0 0,1 0,1 0 1.1 117,6 9862,71 <br />2000 Jan 0 0 0 0 1.6 1.6 0 2.2 116,0 9861. 77 <br /> Feb 0 0 0 0 0,7 0,7 0 6,9 109,7 9858,14 <br /> Mar 0 0 4,8 0 1.9 6,7 0 19,0 96,8 9850.41 <br /> Apr 0 0 9.2 0 2,1 11.3 0 4.2 97,5 9850,82 <br /> May 1.3 0 0 18.2 12,7 32.2 0,5 14.4 114,8 9861.09 <br /> Jun 2,9 0 7,7 24,0 11.2 45,8 0,5 17,9 126,6 9867,85 <br /> Jul 0,5 0 0,6 2,6 3.5 7,2 0,7 12,2 119,8 9863,97 <br /> Aug 0,1 0 0.4 0 1.2 1.7 0,5 6,0 115,0 9861.20 <br /> Sep 0,1 ...Q 0.4 0 0,7 1.2 0,5 4,9 ] 10.3 9858.47 <br />Subtotal 5,0 0 <br />Total 5,0 23,1 44,8 36,6 109,5 3.4 95,3 <br /> <br />..., <br />" <br />0- <br />t-' <br />" <br />'" <br />