Laserfiche WebLink
<br />I <br />1 <br />I <br /> <br />x <br /> <br />C <br /> <br />o <br />P <br /> <br />y <br /> <br />UNITED STATES <br />DEPARTMENT OF THE INTERIOR <br />BUREAU OF RECLAMATION <br /> <br />I <br />I <br /> <br />Regional Office, Region 4 <br />P. O. Box 360 <br />Salt Lake City 10, Utah <br /> <br />In Reply <br />Refer To: <br /> <br />I <br />I <br />'I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />4-600 October 25. 1960 <br /> <br />Marion M. Wilson, President <br />Colorado River Basin Consumers Power, Inc. <br />802 Farmers Union Building <br />Denver 3. Colorado <br /> <br />Dear Sir: <br /> <br />As advised in our letter of October 13, 1960. to Harvey F. McPhail <br />with copy to you, a meeting was held in Denver, Colorado. on October 20. <br />1960, with representatives of the five utilities in the area which <br />have submitted proposals for wheeling Colorado River Storage Project <br />power. Bureau representatives explained the methods and procedures <br />we are using in making our current studies paralleling similar <br />discussions we have had with members of your group, As the studies <br />were not complete. they were not made available to the utilities. <br /> <br />However. we are mailing to each of the fLve utilities data pertain- <br />ing to wheeling costs, construction costs of the yardstick transmission <br />system and the transmission system under the utility proposal, and <br />operation, maintenance. and replacement costs. <br /> <br />I <br />I <br />I <br />I <br />I <br /> <br />The annual operation and maintenance cost of the all-Federal yard- <br />stick transmission system is estimated to be $2,274,500. and for <br />replacements $523,000. These costs for the transmission system <br />under the utility proposal are respectively. $1,325,200 and $143,000, <br />annually. The all-Federal yardstick transmission system is estimated <br />to consist of 1136 circuit miles of wood-pole line. 1958 circuit <br />miles of steel-tower line, and associated substations. The Federal <br />transmission system under the utility proposal is estimated to consist <br />of 379 circuit miles of wood-pole line, 696 circuit miles of stee1- <br />tower line, and associated substations. <br />