Laserfiche WebLink
<br />I TAB1.E V <br /> COLORADO RIVER STORAGE PROJECT <br />I DEVELOPMENT OF UTAH ~EELING CHARGES <br /> (million ki1owatthours) <br />I (Sheet 2 of 2) <br /> (g) (h) (i) <br /> Utah Central Total Utah <br />I Wheeling Utah Whee ling <br /> Whee linp; Charges <br />I 1964 47.0 47.0 <br />1965 126.9 126.9 <br />1966 276.2 276.2 <br /> 1967 417.3 417.3 <br />I 1968 677.7 677.7 <br />1969 765.7 765.7 <br /> 1970 893.6 893.6 <br />I 1971 1.050.9 1,050.9 <br />1972 1,214.3 1,214.3 <br /> 1973 1,120.6 20.7 1,141.3 <br />I 1974 996.0 4+.7 1,037.7 <br />1975 1,466.0 42.0 1.508.0 <br /> ,j, I ~ 1,8!5.8 <br />I 1980 1,81'3.8 42.0 <br />-l, -It J 1,8*2,6 <br /> 1j;0 1,811.0 i.6 <br />,I "" ~ <br />2~0 1,778.5 4~.8 1.819.3 <br />II 1.7tO.6 1,7tO.5 <br />\Y <br />2010 39.9 <br />,j, .t J, <br />2020 1.709.5 39.2 1.748.7 <br />I -\, -It J ~ <br />2030 l,6f'4 38.7 .1,727.1 <br />-it 3f,5 ~ <br /> 2~0 1,676.2 1,714.7 <br />I I ~ <br />2050 1.6%'5.3 ~12 1,703.5 <br />~ J, ~ <br />I 2060 1,657.7 3t.0 l'6f'7 <br />-It t t <br />2063 <br />I 160.380.0 3.613.4 163,993.4 <br />I <br />I <br />I <br />I <br />