Laserfiche WebLink
<br />I <br />I <br />il <br />II <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />RBVENUE UQUlB._iS <br />OF. <br /> <br />COLORADO RIVER STOB.AGE PIt.OJBCT TRANSMISSION SYSTEM <br /> <br />Comparative analysis of Secretary's <br /> <br />May 18, 1960 announcement, and U.S. <br /> <br />Bureau of Reclamation estimated <br /> <br />costs of federal transmission,with <br /> <br />Utilities' April 1960 proposal <br /> <br />\ <br />, <br /> <br />Prepared by <br />Engineering Committee of the <br />Colorado River Basin Consumers Power, Inc. <br /> <br />November 15, 1960 <br />