Laserfiche WebLink
<br /> <br />c.o <br />en <br />o <br />..-j <br /> <br />\ --.~ <br /> <br />RECONNAISSANCE REPORT <br />ON <br />COSTILLA PROJECT <br />COLORADO-NEW MEXICO <br /> <br />(.,:;, <br /> <br />Table of Contents <br /> <br />~ <br /> <br />Location Map------------------------------------Preceding 1 <br /> <br />CHAPTER I - INTRODUCTION----------------------------_____ 1 <br />PurPose----------------------------------------------- 1 <br />Scope of Report-------------------------~------_______ 1 <br />Authority for Report-------------------------------___ 1 <br />Cooperation and Acknowledgments--------------------___ 2 <br /> <br />CHAPTER II - DESCRIPTION OF THE BASIN---------------_____ 3 <br />Location and Gener~l Description---------------------- 3 <br />Surface Water Resources--------------------------_____ 4 <br />Quality of Water-_-_---------------------------------- 5 <br />Settlement and Development---------------------------_ 5 <br /> <br />CHAPTER III - HISTORY OF INVESTIGATIONS------------------ 7 <br />CHAPTER IV - PROBLEMS AND NEEDS-----------------------___ 8 <br /> <br />~ V - PLAN OF DEVELOPMENT---------------___________ 10 <br /> <br />CHAPTER VI - HYDROLOGY-------------------________________ 13 <br />Water Supply--------------~-------------______________ 13 <br />Water Rights--------------------------------__________ 13 <br />CO$tilla Creek Compact----------------------------- 13 <br />Rio Grande Compact-----~---------------____________ 13 <br />Eastdale Area-------------------------------_______ 13 <br />Historic Condition Study--------------------------____ 13 <br />Evaporation-----------------------------________------ 17 <br />Consumptive Use--------------------------_____________ 18 <br />Effective Precipitation-----------------------________ 18 <br />Farm Irrigation and Distribution Efficiency------------ 18 <br />Cerro Canal--------------------------______________ 18 <br />Eastdale Intake Canal-------------------------_____ 20 <br />Culebfa-Eastdale Canal--------------------------___ 20 <br />Eastdale Reservoir No. 1--------------------------- 23 <br />Eastdale Distribution System----------------------- 23 <br />Soil Moisture-----------------------__________________ 23 <br />Diversion Demand-_-------u----u------------_________ 23 <br />Co~act Entitlement---------------------______________ 26 <br />Sedxment~tion and Area-Capacity Curves---------------- 26 <br />Costilla and Amalia Reservoirs-----------------___ 26 <br />,Eastdale Reservoir No. 1--------------------------- 28 <br /> <br />i <br />