My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP10580
CWCB
>
Water Supply Protection
>
Backfile
>
10001-10999
>
WSP10580
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 3:13:43 PM
Creation date
10/12/2006 4:24:36 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8270.100
Description
Colorado River Basin Water Quality/Salinity -- Misc Water Quality
Basin
Colorado Mainstem
Water Division
5
Date
12/1/1995
Title
Colorado River Water Quality Improvement Program - Lower Gunnison Basin Unit - East Side Laterals - Salinity Control Project - FINAL ENVIRONMENTAL ASSESSMENT
Water Supply Pro - Doc Type
EIS
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
63
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />,I <br />'r <br /> <br />, <br />.' , <br /> <br />CHAPTER 2 - ALTERNATIVES <br /> <br />o <br />0- <br />-J <br />en <br /> <br />No Action <br /> <br />The No Action alternative (i.e., not laking action to reduce salinity from the Unit) is <br />described in the FR/FES. Under it, no canals or laterals would be improved using salinity <br />control funds. <br /> <br />1984 Plan <br /> <br />The 1984 Plan was the recommended alternative of the FR/FES, and was named ."Plan A-2." <br />It's major features were: <br /> <br />. Concrete-line 59 miles of canals and 195 miles of laterals east of Uncompahgre River; <br /> <br />. Conslnlct improvements over a 7-year period under contracts with private fmns; <br /> <br />. Acquire/develop 2,100 acres of habitat replacement land for management by a non- <br />Federal agency. <br /> <br />The plan assumed the canals and laterals would be lined with a thin, 3-inch, layer of <br />concrete. Where necessary, flexible lining material would be used. Habitat replacement was <br />to compensate for the loss of an estimated 610 acres of wetlands, and reduction in quality to <br />1,260 acres. Replacement areas were to be located primarily along the Uncompahgre River. <br /> <br />The FR/FES cost estimates used January 1981 prices. Table 1 updates the total cost reported <br />to January 1994 price levels. Habitat replacement costs for the canals vs. laterals were not <br />separately identified. A later inventory of wetlands showed about 57 percent of the costs <br />could be attributed to lining only the laterals. <br /> <br />Table 1 - Update of 1984 Plan Cost &timates <br /> <br /> Jan. 1981 Jan. 1994 <br />Feature Price Level Price Level <br />Lateral Lining $68,600,000 $90,450,000 <br />Habitat Replacement, Laterals $2,750,000 $2,998,000 <br />TOTAL $71,350,000 $93,448,000 <br /> <br />This total capital investment cost was amortized over a 50-year period at 7 3/8 percent <br />interest to show annual costs. The annualized cost for the laterals at 1981 price levels would <br />have been about $5,260,000. Updated to 1994 price levels and assuming an 8 percent <br />interest rate, annual costs of the 1984 Plan would be about $7,640,000. <br /> <br />5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.