My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP10577
CWCB
>
Water Supply Protection
>
Backfile
>
10001-10999
>
WSP10577
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 3:13:41 PM
Creation date
10/12/2006 4:24:33 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.101.10.B
Description
Glen Canyon Dam/Lake Powell
State
AZ
Basin
Colorado Mainstem
Date
9/1/2000
Title
Glen Canyon Dam Technical Work Group Operating Procedures
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />l <br />~ <br /> <br />~ <br />'. <br /> <br />.- .~.-- <br />~ 01 " _ <br /> <br />by the group in a preceding meeting. The staff will arrange meeting rooms and audio visual <br />equipment, and block a number of hotel guest rooms. Meeting rooms will be arranged so that each <br />of the 26 TWG members can be seated around the table. Alternates representing an absent TWG <br />member should take their place at the table. Additional seating will be provided around the margin <br />or rear of the room for alternates who are attending with the member, for official visitors and for the <br />general public. <br /> <br />;1 <br /> <br />,'.' <br /> <br />12. Public. Visitors. and Ooen and Closed Meetings. - All meetings are open to the public. It is not <br />anticipated the group will require closed sessions unless a provision is made to do so. Onlymembers <br />of the TWG or their alternate may participate in discussions of the group. Appropriate staff of <br />Reclamation and the GCMRC shall provide pertinent information from their organization to respond <br />to questions or make presentations when approved by the group. The public will be allowed to <br />comment after discussion of each agenda item requiring a decision of that group and at the end of <br />the TWG meeting or as provided in the agenda. Each person will be given up to 10 minutes to <br />address the TWG members at the time specified on the agenda for public comment. Greater <br />consideration will be given to individuals submitting discussion issues and/or requesting time in <br />advance of the meeting to the Chairperson. The Chairperson will control adherence to the time limit <br />so the meeting is not unduly prolonged. Each speaker will be expected to provide their name and <br />affiliation for the meeting minutes. The Chairperson will accept written comments from the public, <br />and will allow their distribution if copies are available for all members (40 copies required). Written <br />comments will be attached to the meeting minutes if they are identified with the name, address, and <br />affiliation of the provider. <br /> <br />:;., <br />" <br />.-.. <br /> <br />.+ <br />~~ <br /> <br />" <br /> <br />Adopted by vote of the TWG on <br /> <br />. Phoenix, Arizona. <br /> <br />'~'. <br /> <br />:.,' <br /> <br />Approved: <br /> <br />~;i: <br /> <br />Chairperson <br /> <br />Date <br /> <br />'<' <br />!~~; <br />~;: <br />.~ <br /> <br />Updated: 9/21100 <br /> <br />,-,_. <br /> <br />7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.