Laserfiche WebLink
<br />" . <br /> <br />previously authorized units are to be repaid from the Basin <br /> <br />~ Funds over 50 years without interest. <br />'f) <br />~~ 7. Compliance with procedural and substantive State <br />""'" <br /> <br />water law. <br /> <br />B. Deauthorization of the Crystal Geyser Unit <br /> <br />initially authorized for construction under P.L, 93-320, <br /> <br />The Secretary of the Interior was also directed to do <br /> <br />advance planning studies on Sinbad Valley, a BLM project, <br /> <br />The Evaluation Process <br /> <br />~/' cfrllD <br />/t!p::, <br />ttV' ;P <br /> <br />WHERE TO NOW? <br /> <br />Continue the joint evaluation process conducted by the <br /> <br />Department of the Interior and the Department of <br /> <br />Agriculture, using a budget constraints computer model to <br /> <br />determine the optimal combination of projects and <br /> <br />construction timing to meet salt load reduction goals at <br /> <br />minimum investment levels, <br /> <br />This provides a program <br /> <br />management tool to accomplish salinity control objectives <br /> <br />at minimum cost. This approach to long-term, program-wide <br /> <br />analysis is helpful to Federal program managers when <br /> <br />{~J <br />rv.P <br /> <br />weighing the many budget choices each year, <br /> <br />d~ <br /> <br /> <br />l <br /> <br />In addition, a repayment analysis model indicates the Lower <br /> <br />, <br /> <br />Colorado River Basin Fund can repay its share of the total <br /> <br />27 <br />