My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP10571
CWCB
>
Water Supply Protection
>
Backfile
>
10001-10999
>
WSP10571
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 3:13:39 PM
Creation date
10/12/2006 4:24:30 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8273.100
Description
Colorado River Basin Salinity Control - Federal Agencies - Bureau of Reclamation
Basin
Colorado Mainstem
Water Division
5
Date
1/1/1986
Author
BOR USDA BLM
Title
Salinity Update - Special Edition January 1986
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />..... <br />c.rr <br />'-' <br />c.o <br /> <br />INTERIOR'S ROLE <br /> <br />Federal coordination is accomplished using the lead agency <br /> <br />concept. <br /> <br />The Bureau of Reclamation, acting for the <br /> <br />Secretary of the Interior, has the responsibility for <br /> <br />implementing salinity control measures. <br /> <br />Interagency <br /> <br />coordination is formalized through a series of joint <br /> <br />agreements executed at the Department level, Coordination <br /> <br />at the field administrative/technical level is accomplished <br /> <br />through the Colorado River Interagency Salinity Control <br /> <br />Committee, <br /> <br />Bureau of Reclamation <br /> <br />Units initially authorized for construction were the Grand <br /> <br />Valley, Paradox Valley, and Las Vegas Wash Units. The <br /> <br />following map shows all units Reclamation has been <br /> <br />studying. <br /> <br />Reclamation's construction of the Grand Valley Unit Stage <br /> <br />One is complete. A field station, seven miles of the <br /> <br />Highline Canal lining, and the associated pipe lateral <br /> <br />construction was finished for the 1983 irrigaton season. A <br /> <br />moss and debris removal structure was built to control the <br /> <br />trash problems on the lined canal. <br /> <br />Reclamation's data collection for the Stage Two area <br /> <br />specifications and designs are underway, Reclamation <br />12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.