My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP10512
CWCB
>
Water Supply Protection
>
Backfile
>
10001-10999
>
WSP10512
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 3:13:20 PM
Creation date
10/12/2006 4:21:45 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.125.H
Description
San Juan-Chama Project
State
NM
Basin
San Juan/Dolores
Date
2/1/1963
Author
USDOI/BOR
Title
Accounting of Water San Juan-Chama Project Colorado-New Mexico
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br />lands, and (3) return now from use of stored water and from additiomal . <br />natural-flow diversions t'O the new lands. The. first two cause depletions <br />to Rio Grande flows. The third inGreases the flows of the Rio Grande <br />above otowi at certain times. <br /> <br />The suggested aCClOunting method for the daily or short-term <br />effect tributary units would have on the Rio Grande flows and.re:place- <br />IlJlIlnt releases required from Reren No. It. Reservoir are described below. <br /> <br />Storage <br /> <br />Whenever water is stered in project rese:t"V'oirs of a tributary <br />unit, an equivalent release wouJ.d be made trom Heron No. 4 Reservoir. <br />This can be made on the same day, &1' if neeesary, lagged by hours or <br />days to allow for ease in eOllDlllmieations. <br /> <br />Direct :Flow Diversions <br />~~ <br /> <br />The procedures :tor all of the tributary w:t:l.ts have the cOllllllOn <br />hypothesis that the units are entitled to direct flow diversions withOut <br />replacemant releases from Heron No.4 Reservoir to the extent thS.t theSE! <br />diversions would have been made under pre-project conditions. All <br />additional direct diversions of natural flow are<:conside:red replaceable <br />by equivalent releases from He:t'on No. 4 Reservoir. <br /> <br />:Bypasses may be required at diversion ;points, as well as below <br />rese:t"V'oirs, to meet downstream p"'ior rights a:n.dfor to maintain streams <br />for fish and wildlife purposes. Gages would be installed as needed to <br />properly accO'lmt tor such bypasses. <br /> <br />Return Flow Credit <br /> <br />Since part of the increased divers:l.ons, both from storage and <br />natural flow, w:Ulleave the project area and return to the river as <br />return flow, an a.ppre>priate credit will be given :for this 1nl:reased <br />return flow on a daily or other short period basis iu lllaking delivery <br />of' San JuanpChama water at Otowi. <br /> <br />Return flow will be com;pu:t;edtor tr:l.butary unit areasa.sa <br />aUf'erencebErtireen. dlverdons ot natUral f'1owS plus. storage releases <br />aiid."net'consumpt1Ve use; The1Zei:m lfniitui'alflOw". as is usedherelit""' <br />exclti.d.e"s - rtidiverted. i-eturi:t" flows; 0 "Net cansiii:n:Pt:lve 'use'" is"cQiisUil!Pt:l.ve" . <br />use' (iollij;ll1ted'ooy standard :t'grmulas, such as Blaney"C:t'iddle, less ef:f'eetive <br />precipitation. <br /> <br />It wi.ll be necessary to cQllij;lUte the return flows that would <br />have left the project area. under pre-pr0ject eondi t:l.ons as well as the <br />return flow lea.ving the area Ul'lder p:t'oject conditions to determine the <br />appropriate credit tcnl"' increased l'eturn flow. The consUllqrtiveuse to <br />be applied in determining return flows thet would have occurred ude:t' <br /> <br />19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.