Laserfiche WebLink
<br /> <br />lands, and (3) return now from use of stored water and from additiomal . <br />natural-flow diversions t'O the new lands. The. first two cause depletions <br />to Rio Grande flows. The third inGreases the flows of the Rio Grande <br />above otowi at certain times. <br /> <br />The suggested aCClOunting method for the daily or short-term <br />effect tributary units would have on the Rio Grande flows and.re:place- <br />IlJlIlnt releases required from Reren No. It. Reservoir are described below. <br /> <br />Storage <br /> <br />Whenever water is stered in project rese:t"V'oirs of a tributary <br />unit, an equivalent release wouJ.d be made trom Heron No. 4 Reservoir. <br />This can be made on the same day, &1' if neeesary, lagged by hours or <br />days to allow for ease in eOllDlllmieations. <br /> <br />Direct :Flow Diversions <br />~~ <br /> <br />The procedures :tor all of the tributary w:t:l.ts have the cOllllllOn <br />hypothesis that the units are entitled to direct flow diversions withOut <br />replacemant releases from Heron No.4 Reservoir to the extent thS.t theSE! <br />diversions would have been made under pre-project conditions. All <br />additional direct diversions of natural flow are<:conside:red replaceable <br />by equivalent releases from He:t'on No. 4 Reservoir. <br /> <br />:Bypasses may be required at diversion ;points, as well as below <br />rese:t"V'oirs, to meet downstream p"'ior rights a:n.dfor to maintain streams <br />for fish and wildlife purposes. Gages would be installed as needed to <br />properly accO'lmt tor such bypasses. <br /> <br />Return Flow Credit <br /> <br />Since part of the increased divers:l.ons, both from storage and <br />natural flow, w:Ulleave the project area and return to the river as <br />return flow, an a.ppre>priate credit will be given :for this 1nl:reased <br />return flow on a daily or other short period basis iu lllaking delivery <br />of' San JuanpChama water at Otowi. <br /> <br />Return flow will be com;pu:t;edtor tr:l.butary unit areasa.sa <br />aUf'erencebErtireen. dlverdons ot natUral f'1owS plus. storage releases <br />aiid."net'consumpt1Ve use; The1Zei:m lfniitui'alflOw". as is usedherelit""' <br />exclti.d.e"s - rtidiverted. i-eturi:t" flows; 0 "Net cansiii:n:Pt:lve 'use'" is"cQiisUil!Pt:l.ve" . <br />use' (iollij;ll1ted'ooy standard :t'grmulas, such as Blaney"C:t'iddle, less ef:f'eetive <br />precipitation. <br /> <br />It wi.ll be necessary to cQllij;lUte the return flows that would <br />have left the project area. under pre-pr0ject eondi t:l.ons as well as the <br />return flow lea.ving the area Ul'lder p:t'oject conditions to determine the <br />appropriate credit tcnl"' increased l'eturn flow. The consUllqrtiveuse to <br />be applied in determining return flows thet would have occurred ude:t' <br /> <br />19 <br />