Laserfiche WebLink
<br />. <br /> <br />HOUSE DOCKET NO. 1087, 84TH CONGRESS <br /> <br />ttTherefore, the committee expects the proposal <br />by the private power companies for cooperation in <br />the development to be carefully considered by the <br />Department of the Interior and the electric power <br />and energy of the project to be marketed, so far as <br />possible, through the facilities of the electric utilities <br />operating in the area, provided, of course that the <br />power preference laws are complied with and project <br />repayment and consumer power rates are not ad- <br />versely affected. 11 <br /> <br />CHART X <br /> <br />EXCERPT OF LETTER OF JANUARY 19, 1960 <br />FROM- MR. E. O. LARSEN, REGIONAL DIRECTOR OF <br />THE BUREAU OF RECLAMATION AT SALT LAKE CITY <br />TO MR. NAUGHTON <br /> <br />. <br /> <br />"4. Charges made for delivery of power must <br />not adversely affect project feasibiUty and payout, <br />and particularly must be such as not to reduce quantity <br />or timing of irrigation assistance. It <br /> <br />CHART XI <br /> <br />TRANSMISSION CHARGE <br />PER/KWH <br /> <br />, <br /> <br />1.66 <br />MllU <br /> <br />I <br />$ 492 <br />MilLION <br />--L <br /> <br />2.53 <br />TAXES MILLS <br />.! ~76_ ~L~I~N_ <br /> <br />2 <br /> <br />GOVERNMENT'POR1~ <br />OF TRANSMISSION ~~! <br />(INTEREST, OPERATON <br />MAINTENANCE ANO <br />REPLACEMENT <br />INCLUOING.INVESTMEN <br /> <br />UTILITY <br />WHEELING <br />CHARGES <br /> <br />IRRIGATtON ASSISTANCE <br />FROM TRANS- <br />MISSlqN <br /> <br />o ALL FEDERAL SYSTEM (100 YEARS) UTILITIES COMBINATION SYSTEM <br /> <br />$ 388,728,000 <br /> <br />CHART XII <br /> <br />, <br />