Laserfiche WebLink
<br />Introduction <br /> <br />The operation of the Colorado River Basin during the past <br />year and the projected operation for the current year reflect <br />flood control, river regulation, beneficial consumptive uses, <br />hydroelectric power generation, water quality control, <br />enhancement of fish and wildlife, recreation, and Colorado <br />River Compact requirements, <br /> <br />Storage and release of water from the Upper Basin reservoirs <br />are governed by all applicable laws and agreements <br />concerning the Colorado River, including the impoundment <br />and release of water in the Upper Basin required by Section <br />602(a) of the Colorado River Basin Project Act of September <br />30, 1968 (Public Law 90-537), The operation of the Lower <br />Basin reservoirs reflects Mexican Treaty obligations and <br />Lower Basin contractual commitments. <br /> <br />Nothing in this report is intended to interpret the provisions <br />of the Colorado River Compact (45 Stat. 1057), the Upper <br />Colorado River Basin Compact (63 Stat, 31), the Water Treaty <br />of 1944 with the United Mexican States (Treaty Series 994, 59 <br />Stat. 1219), the United States/Mexico agreement in Minute <br />No, 242 of August 30, 1973, (freatySeries7708; 24 UST 1968), <br />the Decree entered by the Supreme Court ofthe United States <br />in Arizona v. California et al, (376 U ,S, 340). the Boulder <br />Canyon Project Act (45 Stat. 1057), the Boulder Canyon <br />Project Adjustment Act (54 Stat. 774; 43 U,S,C, 618a), the <br />Colorado River Storage Project Act (70 Stat. 105; 43 U,S.c. <br />620), the Colorado River Basin Project Act (82 Stat. 885; 43 <br />U ,S,c. 1501), the Colorado River Salinity Control Act (88 <br />Stat. 266; 43 U,S,C. 1951), or the Hoover Power Plant Act of <br />1984 (98 Stat. 1333), <br /> <br />Authority for Report <br /> <br />Pursuant to the Colorado River Basin Project Act (Public <br />Law9O-537) of 1968,1 am pleased to present to the Congress, <br />and to the Governors of the Colorado River Basin States, the <br />nineteenth annual report on the Operation of the <br />Colorado River Basin, <br /> <br />This report describes the actual operation of the reservoirs in <br />the Colorado River drainage area constructed under the <br />authority of the Colorado River Storage Project Act, the <br />Boulder Canyon Project Act, andtheBoulder Canyon Project <br />Adjustment Act during water year 1989, and the projected <br />operation ofthese reservoirs during water year 1990 under the <br />'Criteria for Coordinated Long-Range Operation of <br />Colorado River Reservoirs," (Operating Criteria) published <br />in the Federal Re~ister June 10, 1970, <br /> <br />The Operating Criteria and Section 602 of Public Law 90-537 <br />mandate consultation with representatives of the Governors <br />of the seven Basin States and the Upper Colorado River <br />Commission relative to annual plans for operation of the <br />Colorado River reservoirs, The 1990 Annual Operating Plan <br />(AOP) was prepared by the Bureau of Reclamation in <br />consultation with the seven Basin States Governors' <br />representatives, the Upper Colorado River Commission, and <br />others, <br /> <br />Manuel Lujan, Jr., Secretary <br />United States Department of the Interior <br /> <br />1 <br />